ExTox ET-4D2-24 Instruction Manual Download Page 20

 

Instruction Manual

ExTox IMC-8/-4

 
 

Page 20 of 22 

 

BA_IMC-8_-4_e_2019-12-17.docx 

 

7

 

Application Hints 

Here the application remarks in the Instruction Manual of the Control Units Series ET-8D and ET-
4D2 are valid. 

8

 

Installation 

The following figure shows the modular construction of the IMC with single transmitters.  

 

 
 
 
 
 
 
 
 
Measured Gas Pumpe 
 
 
 
Flame Arrestor, 
automatic   
condensate trap 
 
 
 
 
 
Gas connection, 
Condensate outlet 

 
 
 
 
Space for  
Gas Transmitter 
 
 
 
 
Flow rate  
Monitoring 
 
 
 
Connection PCB for 
transmitter and digital 
inputs and relays out-
puts 
 
 
 
 
Cable Glands 

 

 

8.1

 

Mechanical Installation 

The wall mounted housing should be installed at an easily accessible place to enable the 
reading out of messages at every time and to ensure an easy maintenance. 
Please pay attention to the indicated operation temperature for the IMC and build in transmitters 

( DB). The IMC should be installed protected against weather conditions and bigger climatic 
fluctuations. 
In general we do not recommend an installation outside, as in principle measuring accuracy and 

lifetime are influenced in a negative way. In case it is however necessary, please contact ExTox 
to design a suitable type. For this the following measures are necessary: control unit to be in-

stalled inside, enclosure heating and rain protection cover for housing fans. In addition to this a 
protection against driving rain and direct sun, for example in form of a housing, have to be 
installed. 
The dimensions for assembly and further installation dimensions can be taken from the Technical 

Data Sheet ( DB). The wall mounted housing can be opened by means of a usual two cam lock 
key. 
The IMC itself may not be installed in hazardous areas. The air change via ventilation of the 

housing is that designed that in case of a leakage in the internal hosing the measured gas is 
always that much diluted that a hazardous gas mixture cannot occur inside the housing. Due to 
the rotary speed monitoring of the two fans the function of the so called "inner explosion protec-

tion" is ensured. 

Summary of Contents for ET-4D2-24

Page 1: ...Instruction Manual ExTox Integral Measuring Concepts IMC 8 and IMC 4...

Page 2: ...trial application The Integral Measuring Concepts serve for monitoring gas concentrations in sealed off processes or not accessible areas The IMC Series combines all necessary components in one compac...

Page 3: ...5 3 2 Calibration and Adjustment 16 5 4 Type M 17 5 4 1 Description 17 5 4 2 Replacement of a Transmitter Module 17 6 Operation of the IMC 18 6 1 Flow rate monitoring 18 6 1 1 Types with DDL Module 3...

Page 4: ...itten documentation and is on delivery attached Type specific data for each device should be taken from a corresponding separate and specific Data Sheet This Data Sheet forms consequently part of this...

Page 5: ...ntegrate controlling and monitoring of the components for sampling and preparation of measured gas The measuring channels which are not used for analysis can easily be taken for external trans mitters...

Page 6: ...easuring points temporally one after another Supplementation of switching between measuring points forms a cost saving alternative to using several IMC One single IMC performs the analysis one after a...

Page 7: ...rms and messages as well as keys is installed in the door of the wall mounted housing For description of the indications and facilities please see the Instruction Manual of the control unit In the sur...

Page 8: ...n the menu Channel Configuration by setting the Mode ON Status Monitoring The following status monitoring functions are integrated in this type Rotary speed monitoring of both housing fans Flow rate m...

Page 9: ...for switching between measured gas and test gas Digital input E2 Status signal flow rate only allocated in systems with Flow Meter see 6 1 2 Digital input E3 Status signal housing fans only allocated...

Page 10: ...during measuring phase Attention This means that reset will be pos sible in the next phase If necessary measurement can be started manually see above to reduce the waiting time on longer cycle times T...

Page 11: ...ith DDL Module see 6 1 1 Lower limit of flow rate monitoring in l h Under scale leads to system fault Standard setting 15 l h FLOW MAX 0 to 300 l h Only activated on systems with DDL Module see 6 1 1...

Page 12: ...ystem should not be calibrated you could leave the menu via Esc By means of Start the automatic calibration is started The analogue out puts keep the measured values of the last measurement Calibratio...

Page 13: ...valves which access the corresponding measuring line for measurement inside the IMC are driven by the control unit Via relay outputs the control unit signalises the measuring point for which the measu...

Page 14: ...alve for measuring point 4 activated Relay 9 closed Magnetic valve for measuring point 5 activated IMC 8 Relay 11 closed Magnetic valve for measuring point 6 activated IMC 8 Relays K12 K18 K19 K6 K7 K...

Page 15: ...witching between 4 measuring points OPTIONS M1 ON 1 H RS232 1 M2 ON 1 H FLOW MIN 15 l h M3 ON 1 H FLOW MAX 300 l h M4 ON 2 L MAX CH 4 v ESC SAVE MAX CHANNEL indicates the number of measuring points he...

Page 16: ...cognized by the software and calibration menu is automatically extended CALIBRATION FLOW 31 l h F1 CAL H2S 0 3000 ppm F2 CAL H2S 0 100 ppm H2S HI H2S LO ESC In case calibration is started with F1 H2S...

Page 17: ...l get a Replacement Transmitter Module Art 295xxx on which all wear parts have been replaced The module has been checked completely and adjusted It has the same warranty as for a new module In case yo...

Page 18: ...every second In case the serial data link between control unit and DDL Module is interrupted for more than 15 s the message COMERROR is issued A fault of control unit is indicated at the control unit...

Page 19: ...midification is done by means of a Peltier cooler The temperature of measured gas is factory sided adjusted to 5 C and monitored During the warm up phase a fault message is issued until the cooler rea...

Page 20: ...bigger climatic fluctuations In general we do not recommend an installation outside as in principle measuring accuracy and lifetime are influenced in a negative way In case it is however necessary pl...

Page 21: ...efore the line gets into the IMC If necessary please contact your partner at ExTox Operation in most of the compositions of measured gas is reliably possible due to the construction of the IMC Only fo...

Page 22: ...O2 H2S3000 295008 Replacement Transmitter Module CH4 O2 H2S100 940006 Measured Gas Pump 940007 Condensate Trap 940010 Hose Pump 300 ml h 940011 Replacement Hose for hose pump 300 ml h 940021 Measured...

Reviews: