Installation
Beijer Electronics, MAEN966
9
2
Installation
2.1 Space Requirements
– Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)
– Space requirements when installing the operator panel:
Caution
The openings on the enclosure are for air convection. Do not cover these
openings.
2.2 Installation Process
1. Unpack and check the delivery. If damage is found, notify the supplier
.
Note:
Place the operator panel on a stable surface during installation.
Dropping it or letting it fall may cause damage.
2. Place the panel cut out where the operator panel is to be situated, draw along the
outer sides of the holes and cut according to the markings.
50 mm
100 mm
60 mm
304 mm
398 mm
100 mm
(4.0 inch)
100 mm
(4.0 inch)
(4.0 inch)
(2.0 inch)
50 mm
(2.0 inch)
(11.97 inch)
(15.67 inch)
(2.36 inch)
x 14
Panel cut out 355.5 x 278.5 mm
(14.0 x 10.96 inch)
Summary of Contents for EXTER T150sr
Page 1: ...EXTER T150sr Installation Manual MAEN966 2008 11 English...
Page 4: ...Table of Contents Beijer Electronics MAEN966...
Page 8: ...Safety Precautions 8 Beijer Electronics MAEN966...
Page 12: ...Installation 12 Beijer Electronics MAEN966...