2

Installation

2.1

Operation  
The control system is installed in the boiler room.

2.2

Electric connection

EBC 11 is connected to a supply volt-
age of 230V.

The terminals of the control system are spring-
loaded. For installing of the conductors it is necessary 
to use a suitable screwdriver. Fig. 2 shows how the 
conductors are installed.

Terminals (Fig. 3)

Supply L1 (230V)

Supply N

Supply PE

4-5  Boiler thermostat 1. Opto coupler (~/-10-230V)
6-7   Boiler thermostat 1. Opto coupler (~/+10-230V)
8  

24V DC supply for voltage free contact

9  

LK0V DC supply for voltage free contact

10   Boiler thermostat 2. Opto coupler (~/-10-230V)
11   Boiler thermostat 2. Opto coupler (~/+10-230V)
12   24V DC supply for voltage free contact
13   0V DC supply for voltage free contact
14   Boiler relay switch Common (max 230V AC 8A)
15   Boiler relay switch Normally Open (max 230V 

AC 8A)

16   PDS - C (Common) pressure differential switch
17   PDS - NC (Normally Closed) pressure differen-

tial switch

18   PDS - NO (Normally Open) pressure differential 

switch

19   Chimney fan L1 (max. 3A)
20   Chimney fan Nreg
21   Chimney fan PE

2

3

Summary of Contents for EBC11

Page 1: ...EXHAUSTO 3001414 2000 02 01 fm 1 8 44 GB...

Page 2: ...veloped to meet BS 5440 Part 1 1990 and BS 6644 1991 and other relevant European standards Functions When the boiler thermostat calls for heat the chimney fan will immediately start up on full speed W...

Page 3: ...t 1 Opto coupler 10 230V 6 7 Boiler thermostat 1 Opto coupler 10 230V 8 24V DC supply for voltage free contact 9 LK0V DC supply for voltage free contact 10 Boiler thermostat 2 Opto coupler 10 230V 11...

Page 4: ...connected over terminals 1 3 Connection to the boiler control Step 1 The normal start signal for the burner phase is connected to terminal 6 Loop terminals 7 and 14 The start signal for the boiler com...

Page 5: ...cted over to terminal 6 Loop terminals 7 and 14 The start signal for the boiler comes on from terminal 15 Connect neutral from the timer to terminal 4 Neutral for the boiler can be taken from ter mina...

Page 6: ...egistered click sound or the light Fig 6 D goes out Register the PDS value of disengagement Set the PDS to 25 Pa below the registered value of disengagement 7 2 step systems Start step 2 on the system...

Page 7: ...SEE THE WARNING Permanent light in ALARM diode Fig 7 A The chimney fan light is on FAN Fig 7 D Failing chimney draught 1 If PDS light is on Fig 7 E press the RESET but ton for one second Fig 7 B PLEA...

Page 8: ...Graben 40 D 55411 Bingen Kempten Tel 49 6721 9178 0 Fax 49 6721 9178 99 E mail exhausto sparkasse net www exhausto de EXHAUSTO NORGE A S Enebakkveien 117 N 0680 Oslo Tel 47 2268 9006 Fax 47 2268 0384...

Reviews: