![Evolution Aqua eazypod complete Installation And Operating Manual Download Page 13](http://html1.mh-extra.com/html/evolution-aqua/eazypod-complete/eazypod-complete_installation-and-operating-manual_2447180013.webp)
COMMISSIONING & SWITCHING ON THE EAZYPOD COMPLETE
Before you run your EazyPod Complete, you should first check that you have
installed the filter and pipework correctly.
Having taken a last look at your pipework to ensure that everything looks right,
switch on the circulating pond pump, and check for any leaks.
Only after you have satisfied yourself that the EazyPod Complete is installed
correctly should you switch on the electricity supply to the unit.
Your EazyPod Complete is now up and running.
Connection
to mains
electric
for the UV
ballast
Connection
to outlet
back into
the pond
Connection
to inlet from
the pond
Connection
to waste
13
Connection
to AirPump
Airline and Air Stones