INSTALLATION
The EazyPod Complete comes to you ready to be installed on a
PUMP FED
set-up
- no changes to any of the fittings are required.
The EazyPod Complete should be situated at a height above the pond water level,
to allow adequate gravity return to the pond (subject to the maximum performance
of your chosen pump).
The gravity return pipe work from the exit point of the EazyPod Complete to the
pond needs to be a minimum of 3 inches (90mm), 4” (110m) for flow rates over
7,500 litres per hour and should have no restrictions. Great care should be taken to
ensure that no air locks are created within the gravity return pipe work. The return
pipe should have an “appropriate fall” from the EazyPod Complete to the pond.
The pipe work from the pond pump to the inlet of the EazyPod Complete will need
to be connected to the 1.5 inch (50mm) slide valve
(M)
. The 4 inch / 90-115 mm
(minimum) gravity return pipe work will need to be connected to the rubber adaptor
(J)
on the outlet point of the EazyPod Complete.
This fitting when first connected to this pipe could appear too big (especially 90mm)
or too large 4” (115mm) – it will however reduce/stretch with the clip provided and
make a tight seal – this is done with a screwdriver. The return pipe is then extended
and returned to the pond or waterfall as required.