![Evo AGA AGA-10-0096-LP-CE Installation & Operation Instructions Download Page 8](http://html1.mh-extra.com/html/evo/aga-aga-10-0096-lp-ce/aga-aga-10-0096-lp-ce_installation-and-operation-instructions_2446296008.webp)
4
3. Unpacking
32”
816mm
25”
635mm
Diameter
11 3/8
”
228mm
19 7/8” 503mm
Cooking Surface:
Lift and separate cooking surface from unit and place next to installation area.
Drip Pan Gasket:
Gasket is secured
to top of drip tray.
Remove gasket from
drip tray and set aside
for reinstallation.
Drip Pan
Unlatch
pan from circular
skirt, then carefully
lift and separate
drip pan from unit
and place next
to installation
area.
Take care
not to scratch
drip pan during
installation.
Chassis:
Lift chassis from
crating box and
place on its side next
to installation area.
Use caution since
ignition components
are exposed.
Metal Right Angle Brackets:
Unscrew from unit and keep
screws and brackets handy for first installation step.
Step. 1
As you are unpacking the crate, make sure you locate all components before installation.
n
The cooking surface is heavy.
Use caution when lifting.
Remove Tie Down
Bolts and Tabs
holding chassis to
packing crate base
using 7/16” wrench.
Summary of Contents for AGA AGA-10-0096-LP-CE
Page 31: ......