WALL MOUNTING
Mount the unit to the wall using
suitable fixtures for the wall
material.
Ensure the wall is suitable for
supporting the load.
Ensure there is no obstruction
at the screw holes such as
electrical cables or water pipes.
PLUMBING
All plumbing work must comply
with national and applicable
national and local plumbing
regulations.
The supply pipe must be flushed
to clear debris.
Cold water connection (inlet) is
on the right side of the unit, hot
water connection (outlet) is on
the left side of the unit; which
need to be connected with the
spout.
The outlet must not be
connected to any tap or fitting
other than those specified.
All plumbing connections must
be completed and checked
for leaks before making the
electrical connections.