background image

2

PHC PARALLEL HYBRID EVAPORATIVE CONDENSERS

Table of Contents

Method of Shipment   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  3

Storage   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  3

General     .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  3

Structural Steel Support   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  3

Rigging the Basin Section     .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 4

Extended Lifts   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  5

Applying Sealer Tape    .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 6

Rigging Coil / Fan Section   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 6

Assembly of the Coil / Fan Section to the Basin Section   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  7

Final Assembly & Startup Details    .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 8

Notes     .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  10

The PHC-E SERIES FORCED DRAFT EVAPORATIVE CONDENSERS 

 should be rigged and assembled using the instructions and

 recommendations outlined in this bulletin. 

All personnel should review these procedures, as well as the latest industry-approved installation 

practices, prior to rigging and assembly.  The information in this bulletin is for informational purposes only. 

  These instructions do not purport to cover all variations and possible contingencies in connection with  

installation.  Additionally, the procedures described herein are subject to change without prior notice,  

due to EVAPCO, Inc.’s ongoing research and development.

EVAPCO, Inc. makes no representations or warranties with respect to these instructions or the products  

described herein.  Nor shall EVAPCO, Inc. be responsible for any loss or damage (direct, indirect, 

 consequential, or other) during installation or handling of equipment after shipment.

For a full description of EVAPCO’s liability policy, please visit www.evapco.com to access our Terms and Conditions. 

Summary of Contents for PHC-D-E

Page 1: ...PHC E SERIES Rigging Assembly Instructions FORCED DRAFT EVAPORATIVE CONDENSERS...

Page 2: ...allation practices prior to rigging and assembly The information in this bulletin is for informational purposes only These instructions do not purport to cover all variations and possible contingencie...

Page 3: ...has not been altered Should the field inspection indicate the section alignment square has been altered please contact the factory or your local EVAPCO sales representative for additional instruction...

Page 4: ...to PHC S1182 PHC D621 to PHC D2050 PHC L463 to PHC L842 AIR IN AIR IN A AIR IN AIR IN AIR IN AIR IN C B Figure 1 Recommended Steel Support for S Models Figure 2 Recommended Steel Support for D Models...

Page 5: ...ting points should be used for final positioning only and for lifting where no danger exists If they are used for extended lifts safety slings and spreader bars should be provided under the sections a...

Page 6: ...ECTION S AS SHOWN IN FIGURES 7 and 8 The bottom of the spreader beam must be a minimum dimension H above the lowest lifting ear to prevent undue strain on the lifting ears and the section structure Th...

Page 7: ...isturbed Place drift pins see Figure 9 in at least three of the corner mounting holes and gradually lower the coil section into place using the drift pins to guide the section down accurately onto the...

Page 8: ...ve is preset at the factory however adjustment should be checked after rigging The float valve should be adjusted so that the center of the float is 1 below the center of the overflow connection when...

Page 9: ...esult of improper water treatment control during the startup of new equipment The initial commissioning and passivation period is critical for maximizing the service life of galvanized equipment EVAPC...

Page 10: ...10 PHC PARALLEL HYBRID EVAPORATIVE CONDENSERS NOTES...

Page 11: ...11 PHC PARALLEL HYBRID EVAPORATIVE CONDENSERS NOTES...

Page 12: ...Inc Edwardsville KS USA 913 322 5165 marketing evaptech com Tower Components Inc A wholly owned subsidiary of EVAPCO Inc Ramseur NC USA 336 824 2102 mail towercomponentsinc com EVAPCO Alcoil Inc A wh...

Reviews: