Cleaning 

 
This chapter provides information on the execution of the operating mode Cleaning:  

 

Personnel and Protective equipment (Page 14) 

 

Selection of the cleaning agent (Page 14) 

 

Preparation (Page 15) 

 

Execution (Page 15) 

 
 
 

ATTENTION 

Warning of material damage due to improper cleaning! 

Improper cleaning leads to damage to the system or its surroundings. 

» 

Cleaning the system according to the instructions in this installation guide. 

» 

Do not use steam jet or high-pressure cleaning devices for cleaning surfaces. 

» 

Do not use compressed air for cleaning and drying surfaces. 

 
 
 

4.1 

Personnel and Protective equipment 

Personnel and Protective equipment 

Specification 

Designation 

Personnel 

Operating personnel 

Personal protective equipment 

Protective equipment against the cleaning agents used 
according to the instructions of the manufacturer of the 
cleaning agents 

 
 
 

4.2 

Selection of the cleaning agent 

The cleaning agents used are specified by the local hygiene officer. 

Observe the cleaning agent manufacturer's instructions. 

Furthermore, observe the following: 

Find application: 

 

Solutions with a pH value between 4.5 and 9 

 

Water under low pressure 

 

Water with temperatures below 40°C 

 
Find no application: 

 

Cleaning products containing chlorine, ammoniac, phosphoric acid or their compounds 

 

Abrasive cleaning products 

 

Solutions with a pH value below 4.5 or above 9 

 

Water under high pressure 

 

Water with temperatures above 40°C 

 

Summary of Contents for EURO-flex

Page 1: ...Quick installation guide Conveyor system EURO flex aluminium...

Page 2: ...lexgmbh de Internet www euroflexgmbh de The document is protected by copyright All rights are strictly reserved Copying reproduction translation or conversion to an electronic medium or machine readab...

Page 3: ...ns 7 2 4 6 Specialist pneumatic personnel 7 2 4 7 Specialist hydraulic personnel 7 2 5 Personal protective equipment 7 2 6 Protective enclosure Protective cover 7 2 7 Spare parts and their purchase 8...

Page 4: ...e department will be happy to advise you on technical matters Information on ordering spare parts can be found in the section Spare parts and their purchase Page 8 Customer service Designation Specifi...

Page 5: ...2 2 Obligations of the owner The owner is obliged to implement measures that result from the specifications provided by the Machinery Directive 2006 42 EC The safety accident prevention and environme...

Page 6: ...asks delegated to them and their potential dangers by the owner 2 4 2 Operating personnel Operating personnel are persons who have been instructed on the tasks delegated to them and their potential da...

Page 7: ...neumatic equipment may only be carried out by specialist pneumatic personnel 2 4 7 Specialist hydraulic personnel Specialist hydraulic personnel are persons who as a result of their technical training...

Page 8: ...parts and accessories can be ordered directly from the manufacturer via the following contact Spare parts Contact Designation Specification Company euroflex GmbH Street no Hohe Flum Stra e 62 Postcod...

Page 9: ...he assembly of the machine Overview of EURO flex aluminium Page 9 Assembly the slide rails on the link chain conveyor Page 10 Assembling the link chain Page 13 3 1 Overview of EURO flex aluminium Fig...

Page 10: ...residues and splitters from the entire system area Check that the screw connections on all load bearing and moving parts are tightened correctly Check correct function of bearings and links Check the...

Page 11: ...w slide rail section with a narrow angle running direction see arrow Gently deburr the butt ends 7 Maintain a distance of approx 10 mm between the slide rail ends running direction see arrow 8 Do not...

Page 12: ...running direction 15 Using the drill drill bit 3 4 mm drill a hole in the slide rail and chassis Do not drill through slide rail The underside of the slide rail must not be drilled or protruding 16 Af...

Page 13: ...ion of the conveyor chain as shown in the illustration Info With the system size EURO flex 115 the running direction of the conveyor chain is opposite Variant 1 5 Insert the conveyor chain into the de...

Page 14: ...4 1 Personnel and Protective equipment Personnel and Protective equipment Specification Designation Personnel Operating personnel Personal protective equipment Protective equipment against the cleani...

Page 15: ...with a personal padlock The conveyor system is prepared for cleaning Ready 4 4 Execution Prerequisite conveyor system is switched off and secured against being switched on again conveyor system is pre...

Page 16: ...e regional guidelines and commission a specialist company if required Malfunctions and excessive levels of wear on individual components are likely to result from the use of operating substances that...

Page 17: ...protective devices for completeness and function 8 per shift Operating personnel Replace defective equipment Replace if required Maintenance personnel Check functionality of the operating and display...

Page 18: ...er transition End module for damage and wear 500 Maintenance personnel Flange bearing Check eccentric ring for secure seating 170 Maintenance personnel Check motor plate for secure seating 500 Mainten...

Page 19: ...intenance work Store the maintenance logs 5 4 Repair Incorrect repair work impairs the operational safety This can cause accidents and seriously injure people as a result Observe the following Repair...

Page 20: ...ry or death Prior to starting ensure that no persons are present in the danger zone Do not reach into moving machine parts during operation Maintain a safe distance from moving machine parts during op...

Page 21: ...250 OH 500 OH then check every 500 OH Replace after 4 000 OH Tools aids Steel pin 4 mm x approx 200 mm long Hammer Prerequisite System is switched off and safeguarded against being restarted Perform t...

Page 22: ...shoes Interval 1 000 Bh Quarterly Tool aid Caliper gauge Requirement System is switched off and secured against being switched on again Carry out the following work steps Check the wear of the convey...

Page 23: ...onveyor system EURO flex Al_20221111_EN docx 6 Table of figures Fig 1 Overview of EURO flex aluminium example 9 Fig 2 Assembly the slide rails 12 Fig 3 Assembling the link chain 13 Fig 4 Adjust link c...

Reviews: