Euroflex EURO-flex Quick Installation Manual Download Page 10

 

 

 

10 

Assembly 

 

 

 

Quick installation guide_Conveyor system EURO-flex Al_20221111_EN.docx 

 

 

Information 

Data 

Designation or value 

Personnel 

Maintenance personnel 

Personal protective equipment 

Protective work clothing 

Protective gloves 

Safety shoes 

Tools, aids 

Mitre cutter 

Steel pin (Ø 4 mm x approx. 200 mm long) 

Hammer 

Carpet knife 

Assembly tool 

Drill and drill bit ø 3.4mm 

 

 

WARNING 

Risk of injury and serious damage to property due to improper installation! 

A lack of knowledge about the system and experience in assessing and averting residual risks 
during proper assembly can result in injury and even death. 

» 

Before working on the system, turn it off and guard it from being switched back on. 

» 

Prior to working in the system area, empty or clear the system. 

» 

Regularly remove product residues and splitters from the entire system area. 

» 

Check that the screw connections on all load-bearing and moving parts are tightened correctly 

» 

Check correct function of bearings and links. 

» 

Check the function of the safety devices. 

» 

Wear appropriate personal protective gear in the system area. 

 

Prerequisite: 

 

System is switched off and safeguarded against being restarted. 

 
 
 

3.2 

Assembly the slide rails on the link chain conveyor 

Observe the following during assembly: 

 

Install the slide rails in a number of continuous lengths where possible. 

 

In areas with high loads, the slide rails must be separated to enable expansion. Separation is 
required at bending wheels, deflection units and drive units. 

 

Never connect slide rails in horizontal or vertical sliding bends. 

 

Avoid slide rail connections at the connection points of the guide profiles. 

 

1.  Check the slide rail for damage. 

ǃ 

Only use undamaged slide rails. 

2.  Chamfer the slide rail at the start (viewed in running 

direction). 

Summary of Contents for EURO-flex

Page 1: ...Quick installation guide Conveyor system EURO flex aluminium...

Page 2: ...lexgmbh de Internet www euroflexgmbh de The document is protected by copyright All rights are strictly reserved Copying reproduction translation or conversion to an electronic medium or machine readab...

Page 3: ...ns 7 2 4 6 Specialist pneumatic personnel 7 2 4 7 Specialist hydraulic personnel 7 2 5 Personal protective equipment 7 2 6 Protective enclosure Protective cover 7 2 7 Spare parts and their purchase 8...

Page 4: ...e department will be happy to advise you on technical matters Information on ordering spare parts can be found in the section Spare parts and their purchase Page 8 Customer service Designation Specifi...

Page 5: ...2 2 Obligations of the owner The owner is obliged to implement measures that result from the specifications provided by the Machinery Directive 2006 42 EC The safety accident prevention and environme...

Page 6: ...asks delegated to them and their potential dangers by the owner 2 4 2 Operating personnel Operating personnel are persons who have been instructed on the tasks delegated to them and their potential da...

Page 7: ...neumatic equipment may only be carried out by specialist pneumatic personnel 2 4 7 Specialist hydraulic personnel Specialist hydraulic personnel are persons who as a result of their technical training...

Page 8: ...parts and accessories can be ordered directly from the manufacturer via the following contact Spare parts Contact Designation Specification Company euroflex GmbH Street no Hohe Flum Stra e 62 Postcod...

Page 9: ...he assembly of the machine Overview of EURO flex aluminium Page 9 Assembly the slide rails on the link chain conveyor Page 10 Assembling the link chain Page 13 3 1 Overview of EURO flex aluminium Fig...

Page 10: ...residues and splitters from the entire system area Check that the screw connections on all load bearing and moving parts are tightened correctly Check correct function of bearings and links Check the...

Page 11: ...w slide rail section with a narrow angle running direction see arrow Gently deburr the butt ends 7 Maintain a distance of approx 10 mm between the slide rail ends running direction see arrow 8 Do not...

Page 12: ...running direction 15 Using the drill drill bit 3 4 mm drill a hole in the slide rail and chassis Do not drill through slide rail The underside of the slide rail must not be drilled or protruding 16 Af...

Page 13: ...ion of the conveyor chain as shown in the illustration Info With the system size EURO flex 115 the running direction of the conveyor chain is opposite Variant 1 5 Insert the conveyor chain into the de...

Page 14: ...4 1 Personnel and Protective equipment Personnel and Protective equipment Specification Designation Personnel Operating personnel Personal protective equipment Protective equipment against the cleani...

Page 15: ...with a personal padlock The conveyor system is prepared for cleaning Ready 4 4 Execution Prerequisite conveyor system is switched off and secured against being switched on again conveyor system is pre...

Page 16: ...e regional guidelines and commission a specialist company if required Malfunctions and excessive levels of wear on individual components are likely to result from the use of operating substances that...

Page 17: ...protective devices for completeness and function 8 per shift Operating personnel Replace defective equipment Replace if required Maintenance personnel Check functionality of the operating and display...

Page 18: ...er transition End module for damage and wear 500 Maintenance personnel Flange bearing Check eccentric ring for secure seating 170 Maintenance personnel Check motor plate for secure seating 500 Mainten...

Page 19: ...intenance work Store the maintenance logs 5 4 Repair Incorrect repair work impairs the operational safety This can cause accidents and seriously injure people as a result Observe the following Repair...

Page 20: ...ry or death Prior to starting ensure that no persons are present in the danger zone Do not reach into moving machine parts during operation Maintain a safe distance from moving machine parts during op...

Page 21: ...250 OH 500 OH then check every 500 OH Replace after 4 000 OH Tools aids Steel pin 4 mm x approx 200 mm long Hammer Prerequisite System is switched off and safeguarded against being restarted Perform t...

Page 22: ...shoes Interval 1 000 Bh Quarterly Tool aid Caliper gauge Requirement System is switched off and secured against being switched on again Carry out the following work steps Check the wear of the convey...

Page 23: ...onveyor system EURO flex Al_20221111_EN docx 6 Table of figures Fig 1 Overview of EURO flex aluminium example 9 Fig 2 Assembly the slide rails 12 Fig 3 Assembling the link chain 13 Fig 4 Adjust link c...

Reviews: