INSTALLATION 

PROCEDURE 

The  following  descriptions  are  intended  to  be  read 

together  with  appropriate  image  at  the  beginning  of  the 

document.  The  bold  number  at  the  left  side  of  the 

description represents the image number. 

 

1-a 

 

Foundation Excavation 

The first step of the construction works is to prepare an 

excavation with the minimum basic dimensions of 42 cm 

x 55 cm and at least 60 cm in depth.  
If the charging station is combined with safety arches, a 

larger excavation is needed.  
If  necessary,  the  dimensions  of  the  foundation  can  be 

enlarged  by  adding  reinforcing  steel  to  the  concrete 

foundation to enable construction of a larger foundation. 

1-b

 

The  foundation  anchor  must  be  assembled  before 

installation: 

 

Tighten  the  two  nuts  to  each  end  of  each  rod  (6 
times).  

 

Insert  the  rods  into  the  anchor  frame  and  tighten 
the  nuts  on  the  other  side  to  secure  them  to  the 
frame. 

 

Attach  the  metal  L  profile  to  the  three  bars  and 
fasten  it  using  nuts.  Repeat  the  process  for  the 
other three bars. 

 

 

 
 

2-a 

 

Foundation Building 

1.

 

For the installation of power cables, an installation 
pipe  shall  be  used,  which shall  extend  beyond  the 
upper edge of the finished foundations.  

The  radius  of  curvature  of  the  cables  must  be 
considered  when  installing  the  installation  pipe. 
The  width  of  the  pipe  is  determined  by  the  type 
and cross section of the power cables.  

Summary of Contents for INCH DUO

Page 1: ...Ver 2021 3 EN Etrel INCH DUO QUICK START GUIDE EN...

Page 2: ......

Page 3: ...ersions of international standards The charging station is compliant with IEC 61851 Part 1 Part 21 2 Part 22 international standard which defines conductive AC electric vehicle charging and supports M...

Page 4: ...trical codes legislation and ordinances Warning Before installing and wiring the charging station make sure that the power supply is disconnected remove fuses or deactivate the circuit breaker to prot...

Page 5: ...ible that not all modules are part of an actual device LTE module Frequency bands LTE FDD B1 2100 MHz B3 1800 MHz B5 850 MHz B7 2600 MHz B8 900 MHz B20 800 MHz LTE TDD B38 2600 MHz B40 2300 MHz B41 25...

Page 6: ...lass 2 appliance and must be protected with an upstream overvoltage protection Overcurrent protection Should be installed upstream to protect power supply cable and the charging device Differential pr...

Page 7: ...g steel to the concrete foundation to enable construction of a larger foundation 1 b The foundation anchor must be assembled before installation Tighten the two nuts to each end of each rod 6 times In...

Page 8: ...addition it needs to be temporarily clogged with paper or similar material at both ends so that the concrete cannot enter the pipe 4 When pouring concrete it is first poured into the vicinity of the...

Page 9: ...20 mm of insulation from all cables and attach and compress the appropriate crimp tubes on all cables To prevent cables from getting in the way of mounting the charging station twist them into an ins...

Page 10: ...rt all three phase conductors and the neutral N conductor into the circuit breaker terminals and tighten them firmly Attach the supply ground PE cable to the earthing clamp 8 b When charging station i...

Page 11: ...g station may affect the measurement results or be damaged if tested with higher voltage Before closing the station check the condition of the over current protection elements and the residual current...

Page 12: ...te or for troubleshooting please look at https etrel com charging solutions inch duo www etrel com Etrel d o o Pod jel ami 6 1290 Grosuplje Slovenia EU 2020 Etrel All rights reserved Etrel the Etrel l...