5 | 10
INSTALLATION
PROCEDURE
The following descriptions are intended to be read
together with appropriate image at the beginning of the
document. The bold number at the left side of the
description represents the image number.
1
1-a
Foundation Excavation
The first step of the construction works is to prepare an
excavation with the minimum basic dimensions of 42 cm
x 55 cm and at least 60 cm in depth.
If the charging station is combined with safety arches, a
larger excavation is needed.
If necessary, the dimensions of the foundation can be
enlarged by adding reinforcing steel to the concrete
foundation to enable construction of a larger foundation.
1-b
The foundation anchor must be assembled before
installation:
•
Tighten the two nuts to each end of each rod (6
times).
•
Insert the rods into the anchor frame and tighten
the nuts on the other side to secure them to the
frame.
•
Attach the metal L profile to the three bars and
fasten it using nuts. Repeat the process for the
other three bars.
2
2-a
Foundation Building
1.
For the installation of power cables, an installation
pipe shall be used, which shall extend beyond the
upper edge of the finished foundations.
The radius of curvature of the cables must be
considered when installing the installation pipe.
The width of the pipe is determined by the type
and cross section of the power cables.