background image

 10    |   10 

 

12-b 

The  first  start-up  can  take  up  to  10  minutes.  Follow  the 

instructions on the LCD screen to start charging. 

 

 

Please  consult  with  local  regulations  and  guidance  for 

requirements for installation of possible special signs and 

other designations in the charging station vicinity. 

 
 
 
 
 
 
 
 
 
 
 
 
 

For more documentation, warranty certificate or for 

troubleshooting, please look at:  
https://etrel.com/charging-solutions/inch-duo/ 
 
www.etrel.com 
Etrel d.o.o., 

Pod jelšami 6, 1290 Grosuplje, Slovenia

, EU

 

 

2020  Etrel.  All  rights  reserved.  Etrel,  the  Etrel  logo  and  other  marks  are 

owned  by  Etrel  and  may  be  registered.  All  other  trademarks  are  the 

property  of  their  respective  owners.  Etrel  assumes  no  responsibility  for 

any errors that may appear in this manual. Information contained herein is 

subject to change without notice. 

WEEE: Dispose of the device only at the 

recycling centre. 

 

Summary of Contents for INCH DUO

Page 1: ...Ver 2021 3 EN Etrel INCH DUO QUICK START GUIDE EN...

Page 2: ......

Page 3: ...ersions of international standards The charging station is compliant with IEC 61851 Part 1 Part 21 2 Part 22 international standard which defines conductive AC electric vehicle charging and supports M...

Page 4: ...trical codes legislation and ordinances Warning Before installing and wiring the charging station make sure that the power supply is disconnected remove fuses or deactivate the circuit breaker to prot...

Page 5: ...ible that not all modules are part of an actual device LTE module Frequency bands LTE FDD B1 2100 MHz B3 1800 MHz B5 850 MHz B7 2600 MHz B8 900 MHz B20 800 MHz LTE TDD B38 2600 MHz B40 2300 MHz B41 25...

Page 6: ...lass 2 appliance and must be protected with an upstream overvoltage protection Overcurrent protection Should be installed upstream to protect power supply cable and the charging device Differential pr...

Page 7: ...g steel to the concrete foundation to enable construction of a larger foundation 1 b The foundation anchor must be assembled before installation Tighten the two nuts to each end of each rod 6 times In...

Page 8: ...addition it needs to be temporarily clogged with paper or similar material at both ends so that the concrete cannot enter the pipe 4 When pouring concrete it is first poured into the vicinity of the...

Page 9: ...20 mm of insulation from all cables and attach and compress the appropriate crimp tubes on all cables To prevent cables from getting in the way of mounting the charging station twist them into an ins...

Page 10: ...rt all three phase conductors and the neutral N conductor into the circuit breaker terminals and tighten them firmly Attach the supply ground PE cable to the earthing clamp 8 b When charging station i...

Page 11: ...g station may affect the measurement results or be damaged if tested with higher voltage Before closing the station check the condition of the over current protection elements and the residual current...

Page 12: ...te or for troubleshooting please look at https etrel com charging solutions inch duo www etrel com Etrel d o o Pod jel ami 6 1290 Grosuplje Slovenia EU 2020 Etrel All rights reserved Etrel the Etrel l...

Reviews: