SNOW/ICE CONTROL INSTALLATION GUIDE  |  PART NO. 

24454

 REV 

D

2

Power Cable  

(provided by customer) 

Size for 30 Amp  

maximum load

Sensor Wiring 

#18 AWG jacketed, 

3-conductor

Heater Cable  

(provided by customer) 

Size to system load

Remote Wiring 

#22 AWG jacketed, 

2-conductor

Temperature Sensor 

Assembly Wiring 

#22 AWG jacketed, 

2-conductor

TO HEATER CABLE

Heater Load Line 1 / Yellow

Heater Load Line 2 / Yellow

Heater Ground (sheild) / Green

INPUT POWER

Line 1 / Black

Line 2 (neutral) / White

Ground / Green

Summary of Contents for Snow Switch GF Pro

Page 1: ...stems must be in use at all times to reduce shock and fire hazard and to protect personnel and equipment 3 Electric wiring to heating elements must be installed in accordance with National Electrical Code NEC requirements as well as other local and applicable electrical codes and third party standards 4 Only UL listed 4X raintight conduit hubs and cable glands are to be used The hub is to be conne...

Page 2: ...ad Sensor Wiring 18 AWG jacketed 3 conductor Heater Cable provided by customer Size to system load Remote Wiring 22 AWG jacketed 2 conductor Temperature Sensor Assembly Wiring 22 AWG jacketed 2 conductor TO HEATER CABLE Heater Load Line 1 Yellow Heater Load Line 2 Yellow Heater Ground sheild Green INPUT POWER Line 1 Black Line 2 neutral White Ground Green ...

Page 3: ... as well as required cable and conduit lengths 4 It is recommended to read these installation instruc tions prior to beginning installation INSTALLATION 1 Install the control box Locate and install the control box on a wall using the box itself as a template to determine the mounting hole footprint Install the box to a solid stable surface capable of supporting four times the weight of the box or ...

Page 4: ...o Instruction Manual performPost InstallationTestingasdescribed depending which sensors are used in your system It is important to perform this testing prior to operating the system 9 Once all system components have been properly installed and tested the circuit breaker has been turned on and power is running to the control box the system is operational Now rotate the Hold On Time control knob on ...