60
www.eta.co.at
Maintenance (expert)
Records
3.21
Maintenance (expert)
This maintenance is to be carried out every 3 years or after 5000 hours.
Tasks
Notes
Empty the ash box
•
Remove excess ash from secondary combustion chamber
•
Empty the ash box
•
Check the seals
Check the pressure of the heating system
_________ bar
Check safety devices
•
Visual check of the safety valves
•
Visual check of the thermal relief valve
•
Check operational readiness of the safety devices in the fuel path
Chimney
•
Clean the flue tube
•
Flush the chimney's condensate drain
Clean combustion chamber
•
Clean inside of the secondary combustion chamber
•
Clean tilting grate
•
Clean secondary air openings
•
Clean the ignition tube
•
Check firebed button and firebed switch
•
Check refractory lining
Clean heat exchanger
•
Clean heat exchanger and downdraft channel
•
Clean lambda probe
•
Check heat exchanger tubes
•
Check heat exchanger cleaner
•
Check seal on heat exchanger cover
Clean flue gas recirculator (optional)
•
Clean flue gas recirculation piping
•
Inspecting seals on maintenance covers
Clean the draught fan
Clean the temperature sensor
Check air valve for primary and secondary air
Check the ash box position switch
Check de-ashing system
Clean ignition
Check boiler doors
Check stoker
•
Check stoker drive chain
•
Check gap of the rotary valve position sensor
Check drop chute safety switch
Check end position of the rotary valve
Summary of Contents for HACK 20 kW
Page 5: ...Cleaning and maintenance Maintenance notes 5 ...
Page 62: ...www eta co at ...
Page 63: ......
Page 64: ...www eta co at www eta co at downloads DOWNLOAD ...