22
www.eta.co.at
2500 h / annually
Cleaning and maintenance
Fig. 2-44: Maintenance cover
2.5.7
Establish operational readiness
Switch the boiler on via the mains switch and start
de-ashing.
Establish the boiler's power supply at the mains switch.
Press the [De-ash]
button to de-ash the boiler.
Switch the boiler back on with the On/Off
switch.
Summary of Contents for HACK 20 kW
Page 5: ...Cleaning and maintenance Maintenance notes 5 ...
Page 62: ...www eta co at ...
Page 63: ......
Page 64: ...www eta co at www eta co at downloads DOWNLOAD ...