38
www.eta.co.at
Maintenance (expert)
Cleaning and maintenance
Adjustment requires the removal of the combustion
chamber door. To do this, lift the combustion chamber
door slightly when it is open, unhook it and carefully
place the door next to the boiler.
1
Closing roller holder
2
Hinge
Loosen the flange nuts (top and bottom) on the hinge
and the closing roller holder and evenly reduce the gap
(only slightly) to the boiler.
Fig. 2-96: Reduceing the gap
Retighten the flange nuts. Suspend the door and
check whether it now closes fully. If not, repeat the
process.
Fig. 2-97: Check
Always adjust the hinges and the closing roll-
er mount so that the seal is evenly compressed.
Summary of Contents for ePE-K
Page 7: ...Cleaning and maintenance Maintenance notes 7 ...
Page 43: ......
Page 44: ...www eta co at www eta co at downloads DOWNLOAD ...