![eta 13180LP-T Operation Download Page 14](http://html.mh-extra.com/html/eta/13180lp-t/13180lp-t_operation_2430158014.webp)
14
www.eta.co.at
Empty the ash bins
Inspect the seal in the ash bin lids to ensure it is in
good order, and replace if necessary.
Fig. 4-4: Seal
Inspect the ash bin seals on the boiler to ensure they
are in good order, replace them if necessary.
Fig. 4-5: Seal
Attach the ash bins to the boiler
Reattach the cover to the ash bins and secure with the
fasteners. Then re-open the covers in the lids.
Fig. 4-6: Covers
Push the ash bins over the connections on the boiler
and attach to the boiler with the lever.
Fig. 4-7: Attach the ash bins to the boiler with the lever
Switching on the boiler
Switch the boiler back on with the On/Off
switch.
Summary of Contents for 13180LP-T
Page 1: ...2018 05 24 EN 0000000313 V 005 3 43 0 3308 93222 001 Pellet boiler 180 220 kW Operation ...
Page 29: ...ETAtouch controller Getting to know the control system 29 ...
Page 39: ...ETAtouch controller BufferFlex function block 39 ...
Page 47: ...ETAtouch controller Buffer function block 47 ...
Page 51: ...ETAtouch controller Hot water tank function block 51 ...
Page 55: ...ETAtouch controller Fresh water module function block 55 ...
Page 69: ...ETAtouch controller Solar function block 69 ...
Page 87: ......
Page 88: ...www eta co at www eta co at downloads DOWNLOAD ...