
1/5/2007
EAG Gateway Series Administration Guidelines
MAG-06007 Rev. A
2.
Use the power cable in the shipping package to connect power inlet on the rear end of AG100
and plug the other end to the power outlet of 110V or 220V.
3.
Turn the switch to ON position.
4.
Check to see if the PWR LED indicator is lit. If PWR LED is lit, everything is normal. If not, repeat
Steps 1 to 3.
Note:
If repeated power up fails, please contact customer support. Do not attempt to plug or unplug the
power cable or open EAG while the power switch is on the ON position.
4.8 Final Checks after Installation
After installing EAG and before it is powered on, please make sure of the following:
․
There is ample air space around EAG for heat exhaustion.
․
The shelf and EAG is securely stable and properly grounded.
․
Power cord is standard and made with safety approvals.
․
Recheck all the other cables and wires and their connections.
Note:
It is very important to recheck all the installation work to ensure EAG would function properly and
trouble free.
24