Spraybar DN25 Installation Manual
10
14/06/2021
Step 3
Insert the Spraybar through the cutouts making sure that the water inlet is on
the correct side.
Step 4
Place the mounts over each end and bolt to structure. Set the Spraybar in
approximate correct position and lightly tighten up lock screws.
Step 5
If supplied, position the Filter Kit (Fig 2.) in an appropriate position
(remember that the flexible hose is 2m long), and secure using appropriate
fasteners. The figure below shows an ESS Type 2 Filter Kit. If another type
of Filter Assembly is used, ensure that the assembly is mounted correctly in
an appropriate position adjacent to the Spraybar. ESS has a range of Filter
Kits, including the Type 3, which has pressure control, gauge, filter by-pass
and solenoid valve.
Step 6
Connect the site water supply to the inlet side of the Filter Assembly. If no
solenoid valve is present, ensure that the isolating valve is closed until final
connection is completed. If a solenoid valve is included, connect the solenoid
valve so that the valve is opened when the conveyor belt is running, and if
possible, when material is present on the belt.
Step 7
Connect the flexible hose from the Filter Assembly to the Spraybar. The
Spraybar is now ready for commissioning and operation.
Fig 2.