IPS Belt Cleaner
10
19/11/2021
Figure 2b
– Installation on angled belts
Step 2 Mark-Out Chute Cut-outs
Using the previously marked line as the centre line, mark the chute cut-out and bolt
hole locations as shown in figure 3 below. Repeat on both sides of chute, ensuring
that the cut-outs are accurately aligned with each other.
Note
: If replacing a 20-Ten series cleaner with the IPS cleaner, mount hole and cut-
out configuration is exactly the same.
Figure 3
– Chute Cut-out for all Models
Verify Cleaner Position before Proceeding
If not already done, disassemble the cleaner mount / tensioner assemblies from the
cleaner mainframe. To do this, simply remove the retaining pin in the operator side
mount, and slide the blade cartridge from the mainframe. Then remove the retaining
pin in the far side mount to remove the mainframe.
Summary of Contents for InLine 20-Ten Series
Page 1: ...IPS Belt Cleaner 1 19 11 2021 IPS Belt Cleaner Installation and Operation Manual...
Page 24: ...IPS Belt Cleaner 24 19 11 2021 SECTION 11 INSTALLATION DRAWINGS...
Page 25: ...IPS Belt Cleaner 25 19 11 2021...
Page 26: ...IPS Belt Cleaner 26 19 11 2021 SECTION 12 EXPLODED PARTS DRAWINGS...
Page 27: ...IPS Belt Cleaner 27 19 11 2021...
Page 28: ...IPS Belt Cleaner 28 19 11 2021...
Page 29: ...IPS Belt Cleaner 29 19 11 2021...
Page 30: ...IPS Belt Cleaner 30 19 11 2021...
Page 31: ...IPS Belt Cleaner 31 19 11 2021...
Page 32: ...IPS Belt Cleaner 32 19 11 2021...