13
MAINTENANCE PROGRAM
Maintenance program for swing door BATL:
Each 6 month:
! Attention- Before work on the operator cut main power line.
!Attention-Any part that appear damaged or worn must be changed.
-
-
-
-
-
-
-
-
-
Check that all securing screws are well tightened.
Clean and lubricate moving and sliding components.
Lubricate closing spring if present.
Check wiring connections.
Check that arm connection screw are well tightened.
Check that door leaf are stable and the movement is steady, without friction from full
open to full close position.
Check the condition of the hinges and lubricate it.
Check that speeds, timing, and safety functions are well adjust.
Check that safety and activation sensor are properly functioning.
For spare parts see the spare part list.