background image

2400VS SERIES

 

 

Erie Water Treatment Controls – Belgium

 

Page 18

 

Impeller 

 

1.

 

Remove the outlet from the control valve. 

2.

 

Remove the hub holding the impeller in place. 

3.

 

Remove the impeller. 

4.

 

Reverse the procedure for reassembly. 

 
 

Synchronising valve body and timer head 
 

To  insure  the  proper  operation  of  the  control  valve,  valve  body  and  timer  head  should  be  synchronised  in  the 
service position. Proceed as follows: 
 

Step 1: Timer head

 

 

1.

 

Make sure that the control valve is in the service mode; if the control valve is in regeneration, press the 

scroll 

 button, thus manually advancing it through the regeneration cycles, until the display shows the time of day: 

 

 
 
2.

 

The  flat  side  on  the  drive  shaft  should  be  pointing  down  (mark  on 
the  drive  shaft pointing up (1)); if this is not the case: refer to Parts 
Replacement “Drive motor”. 

 

Step 2: Valve body 

 
1.

 

Remove the drain hose from the drain elbow. 

2.

 

Remove the 6 bolts holding the valve body and cover together. 

3.

 

Lift the valve cover away from the valve body. 

4.

 

Make  sure the arrow on the worm gear is pointing directly towards 
the  second  tooth  on  the  worm  drive  shaft  (facing  the  front  of  the 
control  valve)  (2);  the  2  holes  in  the  rotor  assembly should now be 
exactly aligned with the corresponding holes in the seal disk. 

5.

 

Make sure the valve cover O-ring is clean and securely installed around the raised rib on the valve cover. 

6.

 

Lower the valve cover straight down onto the valve body and press it down firmly and evenly to seat the valve 
cover. 

7.

 

Install the 6 bolts and tighten them in a cross pattern. 

8.

 

Install the drain hose to the drain line fitting. 

 

20:51      1000L 

Summary of Contents for 2400VS Series

Page 1: ...A Division of Aquion Inc 2400VS SERIES Technical Manual...

Page 2: ...age 10 Diagnostics level Page 13 Parts Replacement Printed Circuit Board Page 14 Drive motor Page 15 Injector Page 15 Backwash flow control Page 16 Brine refill flow control Page 16 Brine tee Page 16...

Page 3: ...A Division of Aquion Inc Art Nr Tech_Man ENG 2400VS 2013 06...

Page 4: ......

Page 5: ...resin The throughput is dependent on the maximum permissible pressure drop for the complete water softener and the maximum permissible specific load of the resin generally taken as 40 litres soft wate...

Page 6: ...g pressure Operating temperature Electrical rating 1 4 8 3 bar 20 120 psi 2 48 C 35 120 F 24V 50 Hz max 500 mA Regeneration Controller software regeneration initiation regeneration mode time of regene...

Page 7: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 3 Flow Diagrams SERVICE BACKWASH BRINE SLOW RINSE FAST RINSE BRINE REFILL...

Page 8: ...1 2 23 2 27 1 70 3 94 3 45 0 68 1 06 2 01 1 63 2 42 2 46 1 97 4 28 4 14 0 68 1 17 2 04 1 78 2 61 2 65 2 20 4 58 The following table is only an indication and is valid for an inlet pressure of 3 bar an...

Page 9: ...set by increments of 1 min The following tables are only an indication and are valid for a brine valve with a refill rate that equals or exceeds the rate of the refill flow control Brine refill F C Pr...

Page 10: ...al connections must be done in accordance with local codes Do not install the unit too close to a water heater min 3 m of piping between outlet of unit and inlet of heater water heaters can sometimes...

Page 11: ...press the scroll button again to switch the motor to full speed which will shorten the transfer time needed by the control valve to reach the next position 9 The motor will move the control valve into...

Page 12: ...n the correct time of day during a period of several hours consequently in case of prolonged power failure the time of day might not be maintained if this happens the time of day indication will flash...

Page 13: ...total remaining regeneration time the actual regeneration cycle and the remaining cycle time total remaining actual regen remaining regen time cycle cycle time The control valve can be reset to servic...

Page 14: ...er access code i e key sequence needs to be entered In the programming modes a flashing indication implicates that this parameter can be adjusted by pressing the up button or down button in this techn...

Page 15: ...Press the scroll button again the display will show Press the up button or down button to set the volume of resin 5 Press the scroll button again the display will show Press the up button or down butt...

Page 16: ...ration is started 9 Press the scroll button again the display will show only when the regeneration mode was set to Delayed or Dlyd Immd Press the up button or down button to set the time of regenerati...

Page 17: ...tions that have taken place since installation TotVol display shows the total water usage through the unit since installation LastRgn display shows the water usage at the moment of the last regenerati...

Page 18: ...THE WATER PRESSURE Printed Circuit Board 1 Loosen the 3 front cover screws and remove the front cover 2 Disconnect all connectors from the PCB 3 Remove the flat cable of the 3 button control pad from...

Page 19: ...cover together 3 Lift the valve cover away from the valve body 4 Remove the rotor assembly from the valve cover the white Teflon O ring will remain in the valve cover 5 Remove the seal plate from the...

Page 20: ...f necessary 6 Install the rotor assembly into the valve body ensuring that the arrow on the worm gear is pointing directly towards the second tooth on the worm drive shaft facing the front of the cont...

Page 21: ...ing inside of the float valves shaft 6 Install the float valve straight up into the float chamber of the valve body 7 Reverse the procedure for reassembly refer to Parts Replacement Gasket Timer head...

Page 22: ...nting down mark on the drive shaft pointing up 1 if this is not the case refer to Parts Replacement Drive motor Step 2 Valve body 1 Remove the drain hose from the drain elbow 2 Remove the 6 bolts hold...

Page 23: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 19...

Page 24: ...t 12 Leak at riser tube 12 Verify that riser tube is seated correctly and is not cracked Unit fails to regenerate Cause Solution 1 Faulty electrical supply 1 Verify electrical service fuse transfo 2 D...

Page 25: ...refill flow control 3 Verify that flow control is free of debris Unit uses too much salt Cause Solution 1 Excessive water in brine tank 1 Refer to problem Excessive water in brine tank 2 Unit regener...

Page 26: ...ributor 2 Verify that distributors are free of debris 3 Crushed lower and or upper distributor 3 Replace distributor s Drain flows continuously Cause Solution 1 Defective PCB 1 Replace PCB 2 Defective...

Page 27: ...ecked annually 1 Clean out injector 2 Clean brine refill flow control 3 Clean backwash flow control 4 Verify correct functioning of flow meter clean impeller if necessary 5 Verify programming of timer...

Page 28: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 24 Exploded Views Part Numbers Electronic timer...

Page 29: ...ief flow meter cable 7 15 222 Screw back plate 2x 8 71502 Screw timer cover 3x 9 70962 Back plate 10 2100 206 Drive shaft 11 15 222 Screw drive motor assy 2x 12 72261 Drive motor 13 568 227 2 Worm 14...

Page 30: ...2400VS SERIES Erie Water Treatment Controls Belgium Page 26 Valve body...

Page 31: ...7 L Sleeve mixing valve 25 568 385 2 Brine refill flow control 26 186 118 O ring refill elbow 27 568 336 Refill elbow 28 541 275 Check ball refill elbow 29 413 62 Spring refill elbow 30 21 88 Nut refi...

Page 32: ...30 24VAC 12VA UK plug J no transfo I Injector 4 1 2 5 B Backwash flow control 0 no flow control Nr Gal min L min E 1 6 6 1 F 1 8 6 8 G 2 0 7 6 H 2 2 8 3 J 2 6 9 8 T 3 0 11 4 K 3 5 13 2 L 4 0 15 1 M 5...

Page 33: ......

Reviews: