
Installation Instruction
2.3
Equipment
The instructions in this document describe the installation, or use, of the
following hardware:
•
RBS 3107 cabinet
•
Earth grounding kit
•
Power cables
•
RF cables
•
Transmission cables
•
Alarm cables
•
Site LAN cable
2.4
Conditions
The following conditions must be fulfilled before work starts:
Before Going to the Site
Before going to the site, ensure the following:
•
Site access permission has been received
•
The Site Installation Documentation is available
•
All tools and instruments are available
Before Starting the Installation
Before starting the installation, ensure the following:
•
The site is prepared according to the Site Installation Documentation
•
The existing base frame is undamaged
•
The ordered hardware is available
•
The AC power supply for the RBS 3107 is installed and tested
•
The site earth grounding is installed and tested
•
The antenna system is installed and tested
4
1/1531-COH 109 2073 Uen H 2006-11-06
All manuals and user guides at all-guides.com