
Contents
Contents
1
Introduction
1
2
Prerequisites
1
2.1
Documentation
1
2.2
Tools
3
2.3
Equipment
4
2.4
Conditions
4
3
Procedure
5
3.1
Unpacking and Checking the Material
7
3.2
Positioning and Anchoring the Cabinet
7
3.3
Earth Grounding the Cabinet
10
3.4
Connecting the External Battery Backup (Optional)
11
3.4.1
Installing the Temperature Sensor Cable
12
3.4.2
Installing the External Battery Backup
12
3.5
Connecting the AC Power
16
3.6
Installing the Internal Backup Batteries (Optional)
28
3.6.1
Installing Batteries
28
3.6.2
Connecting the Batteries
30
3.6.3
Securing the Batteries
33
3.7
Connecting Site Transmission from the Transmission
Cabinet (Alternative)
35
3.7.1
Connecting Transmission Cables, Shielded Twisted Pair,
100
, 110
or 120
, Balanced (T1, J1, E1) - Alternative 1
36
3.7.2
Connecting Transmission Cables, Coaxial, 75
,
Unbalanced (E1) - Alternative 2
40
3.7.3
Connecting Transmission Cables, Coaxial, 75
,
Unbalanced (E3, T3) - Alternative 3
45
3.7.4
Connecting Transmission Cables, Fiber Optic - Alternative 4
47
3.8
Connecting Site Transmission from Transmission
Equipment Installed in the RBS (Alternative)
48
3.9
Connecting External Alarms
49
3.10
Connecting the Ericsson GPS Solution
53
3.11
Connecting RF Cables
53
3.12
Powering Up the RBS
55
3.13
Performing Concluding Routines
56
4
Related Documents
57
1/1531-COH 109 2073 Uen H 2006-11-06
All manuals and user guides at all-guides.com