Operation Manual
er900 PC Operation Manual
22
Version: 12/01
Art-Nr: 475.156
Ergometer
Type
er900 PC
Ergometry process
6.2
Preparations for External Control via ECG or PC
The control of the whole ergometry process takes place via the PC or the ECG device.
Any preparations for the ergometry process at the measurement head are not required.
Configure your ECG or PC in accordance with the appropriate operator’s instructions
for ergometry. Start the ergometric session with the ECG or PC.
6.3
Start of the Ergometry Session
Start the ergometric program on your ECG or PC in accordance with the correspond-
ing instructions. After a successful start the ergometer will begin by measuring the qui-
escent value for blood pressure.
6.4
Manual Operation of Ergometry Session
If necessary, the ergometry session , i.e. the load program may be manually controlled
via the measurement head .