background image

                                                                                                                                                                     

JA12132021

 

     

                                            

www.epvscreens.com

                      

   U-00222

 

  

         

 

 

Frame Assembly 

Step  1:

  Place  the  EPE  sponge  (foam)  sheet  on  the  ground  of  the  area  where  the  screen  will  be  assembled.

 

Step 2: 

Position the pieces of the frame on the EPE sponge in the arrangement shown below.

 

 

 

 

 

 

 

 

 

Step 3:

 Insert 

center joint

 (a/b) connectors into 

one-half of the horizontal frame

 (B/C) and secure with the 

M4x7 screws

 (g) as shown in the illustration below.  

Tip: The center joint (b) with the larger diameter holes should be on top. 

 

Step 4:

 

Connect the 

elbow joints (c/d)

 to the top and bottom sections of the vertical frame. Once inserted, 

connect the vertical sections to the horizontal frame sections. Make sure all holes are in alignment and the frame 

pieces are flush (no gaps). They should form perfect right angles. 

 

Tip: The elbow joint (d)with the larger diameter holes should be on top. 

 

 

Step 5. 

Secure the elbow joints by fastening them with 

M4x7 screws 

(g)

, 4 at each corner. 

a. 

b. 

d. 

c. 

Summary of Contents for Polar Star Series

Page 1: ...brightness offer accurate color fidelity and improve contrast levels The Polar Star is best for family rooms educational facilities conference rooms house of worship or any applications in which incid...

Page 2: ...2 2 2 2 2 b Center Joints D5 top position 2 2 2 2 2 2 c Elbow Joints M4 bottom position 4 4 4 4 4 4 d Elbow Joints D5 top position 4 4 4 4 4 4 g M4x7 Screws 24 24 24 24 24 24 h Spring 56 60 66 72 80...

Page 3: ...rews g as shown in the illustration below Tip The center joint b with the larger diameter holes should be on top Step 4 Connect the elbow joints c d to the top and bottom sections of the vertical fram...

Page 4: ...own below Repeat the process for all eyelets Step7 Carefully place the screen on top of the assembled frame as shown below Make sure that the angular edges of the frame are not allowed to come into di...

Page 5: ...the spring to the hole located on the screen material s outer edge in the following order First connect on four corners steps 1 4 make sure all four corners are fixed before proceeding with next spri...

Page 6: ...gular Reflective ALR Ambient Light Rejecting Screen Make sure to follow these instructions in order for the CineGrey3D 5D to perform correctly 1 Ambient Light must not come from the same direction as...

Page 7: ...brackets with the drilled holes on the installation location and screw them in using a Phillips screwdriver If not installing into a structural wood stud use a hollow wall anchor then screw in the M5x...

Page 8: ...tep 12 Position the fixed frame screen onto the top wall brackets fig 1 as shown below and push down at the center of the top of the frame fig 2 to secure For Technical Support or an EPV Screens conta...

Reviews: