background image

                                                                                                                                                                     

JA12132021

 

     

                                            

www.epvscreens.com

                      

   U-00222

 

  

         

 

 

 

 

 

 

 

 

 
 
 

 

 

 

      

 

Frame Parts List 

A.

 

Vertical Frame x 2pcs 

B.

 

½ Horizontal Frame x2 pcs 

C.

 

½ Horizontal Frame x 2 pcs 

Hardware Parts List 

a. 

        M4*4 

b.

                    D5*4 

c

.      M4*4 

d.

           D5*4 

g.

 

h.

 

i. 

j.

 

k. 

l. 

o. 

p. 

r. 

Item

 

Parts List

 

92” 

100”   110”   120” 

135” 

150” 

a.

 

Center Joints- M4 (bottom position) 

b.

 

Center Joints-D5 (top position) 

c.

 

Elbow Joints M4 (bottom position) 

d.

 

Elbow Joints D5 (top position) 

g.

 

M4x7 Screws 

24 

24 

24 

24 

24 

24 

h.

 

Spring 

56 

60 

66 

72 

80 

88 

i.

 

Pull Hook 

j. 

Wall brackets 

k

Wall Screws M5x50 

l. 

Hollow Wall anchors 

o. 

Center Support Bar 

p. 

White gloves 

r. 

Φ3 mm Long Iron (sides) rod 

/ 

 

Short rod (top/bottom) 

2/4

 

2/4

 

2/4

 

2/4

 

2/4

 

2/4

 

8. 

C+B 

B+C 

Red 

Black 

Summary of Contents for Polar Star Series

Page 1: ...brightness offer accurate color fidelity and improve contrast levels The Polar Star is best for family rooms educational facilities conference rooms house of worship or any applications in which incid...

Page 2: ...2 2 2 2 2 b Center Joints D5 top position 2 2 2 2 2 2 c Elbow Joints M4 bottom position 4 4 4 4 4 4 d Elbow Joints D5 top position 4 4 4 4 4 4 g M4x7 Screws 24 24 24 24 24 24 h Spring 56 60 66 72 80...

Page 3: ...rews g as shown in the illustration below Tip The center joint b with the larger diameter holes should be on top Step 4 Connect the elbow joints c d to the top and bottom sections of the vertical fram...

Page 4: ...own below Repeat the process for all eyelets Step7 Carefully place the screen on top of the assembled frame as shown below Make sure that the angular edges of the frame are not allowed to come into di...

Page 5: ...the spring to the hole located on the screen material s outer edge in the following order First connect on four corners steps 1 4 make sure all four corners are fixed before proceeding with next spri...

Page 6: ...gular Reflective ALR Ambient Light Rejecting Screen Make sure to follow these instructions in order for the CineGrey3D 5D to perform correctly 1 Ambient Light must not come from the same direction as...

Page 7: ...brackets with the drilled holes on the installation location and screw them in using a Phillips screwdriver If not installing into a structural wood stud use a hollow wall anchor then screw in the M5x...

Page 8: ...tep 12 Position the fixed frame screen onto the top wall brackets fig 1 as shown below and push down at the center of the top of the frame fig 2 to secure For Technical Support or an EPV Screens conta...

Reviews: