SEGroup Confidential Until: Permanent
Content
1-1 Packaging (Main Unit)
1-2 Packaging (Ink Support Assy.)
1-3 Packaging (Ink Supply cover)
2-1 Assembly (Stand)
2-2 Assembly (Main unit + Stand)
3-1 Setting the Ink Support Assy.
3-2 Setting the Ink Tank
3-3
Confirming the Ink Tank position
3-4 Adjusting the Ink Tank height
3-5 Fixing the Ink Tank
3-6 Setting the Ink Supply cover
4-1 Fill ink into ink tank
5-1 FW update
6-1 Ink charge
7-1 Replace the Maintenance box
8-1 Nozzle check
9-1 Request for customer