SC-F9200 Series
Revision B
DISASSEMBLY & ASSEMBLY
Disassembly and Assembly Procedure
200
SE Group Confidential (Related Staff Only)
3.4.5.20 CR Unit
1.
2.
Remove the Wiper Cleaner.
3.
Remove the Media Loading Lever.
4.
Remove the Right Upper Cover.
5.
Remove the Right Cover.
6.
Remove the Left Rear Cover.
7.
Remove the Left Upper Cover.
8.
Remove the Left Cover.
9.
Remove the APG Unit.
10. Remove the CR Motor.
11. Remove the CR Cover.
12. Remove the Duct CR.
13. Remove the Print Head.
14. Remove the CR Scale.
15. Remove the three screws, and remove the Pulley Holder.
A) Black M3x22 screw with washer: 1 pcs
B) Silver M3x6 S-tite screw with built-in washer: 2 pcs
Figure 3-143. Removing the Pulley Holder
A D J U S T M E N T
R E Q U I R E D
When replacing/removing this part, refer to
Items and the Order by Repaired Part” (p260)
and make sure to
perform the specified operations including required adjustment.
B
A
B
CR Timing Belt Holder
CR Timing Belts
Pulley Holder
Summary of Contents for SC-F9200 series
Page 11: ...SE Group Confidential Related Staff Only C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 37: ...SE Group Confidential Related Staff Only C H A P T E R 2 TROUBLESHOOTING ...
Page 76: ...SE Group Confidential Related Staff Only C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Page 258: ...SE Group Confidential Related Staff Only C H A P T E R 4 ADJUSTMENT ...
Page 365: ...SE Group Confidential Related Staff Only C H A P T E R 5 MAINTENANCE ...
Page 389: ...SE Group Confidential Related Staff Only C H A P T E R 6 APPENDIX ...