SC-F9200 Series
Revision B
DISASSEMBLY & ASSEMBLY
Disassembly and Assembly Procedure
161
SE Group Confidential (Related Staff Only)
3.4.5.9 CR Motor
1.
2.
Remove the Media Loading Lever.
3.
Remove the Right Upper Cover.
4.
Remove the Left Rear Cover.
5.
Remove the Left Upper Cover.
6.
Remove the Left Cover.
7.
Remove the APG Unit.
8.
Loosen the two screws (A) that secure the pulley holder.
9.
Loosen the screw (B) to loosen the tension of the CR Timing Belt.
Figure 3-100. Loosening the CR Timing Belt Tension
A D J U S T M E N T
R E Q U I R E D
When replacing/removing this part, refer to
Items and the Order by Repaired Part” (p260)
and make sure to
perform the specified operations including required adjustment.
C H E C K
P O I N T
Before loosening the tension at the next step, mark the position of
the pulley holder to make the required adjustment easier.
A
B
A
- Left side -
Pulley Holder
Summary of Contents for SC-F9200 series
Page 11: ...SE Group Confidential Related Staff Only C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 37: ...SE Group Confidential Related Staff Only C H A P T E R 2 TROUBLESHOOTING ...
Page 76: ...SE Group Confidential Related Staff Only C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Page 258: ...SE Group Confidential Related Staff Only C H A P T E R 4 ADJUSTMENT ...
Page 365: ...SE Group Confidential Related Staff Only C H A P T E R 5 MAINTENANCE ...
Page 389: ...SE Group Confidential Related Staff Only C H A P T E R 6 APPENDIX ...