![Epiroc ER 100 L Safety And Operating Instructions Manual Download Page 30](http://html1.mh-extra.com/html/epiroc/er-100-l/er-100-l_safety-and-operating-instructions-manual_2417889030.webp)
Safety and operating instructions
30
© Anbaufräsen PC GmbH | 3390 5221 01 | 2020-09-07
Original Instructions
Note: Installation of a hydraulic circuit suitable for operat-
ing a drum cutter on the carrier is the responsibility of the
operator. The actions and safety requirements pertinent
to this can be found in the carrier's operating manual.
For operation of the drum cutter, required adjustments
(pressure and hydraulic flow) on the carrier are the re-
sponsibility of the operator.
• Consult, for installation to a carrier with hydraulic
hammer system, installation plan 1 (see chapter
Hy-
draulic installation version 1 for hydraulic ham-
mer
).
• Consult, for installation to a carrier with hydraulic
shear system, installation plan 2 (see chapter
Hy-
draulic installation version 2 for hydraulic shear
systems
).
Note: If it is necessary to remove the check valve, e.g.
when connecting to a hydraulic shear system for back-
wards and forwards rotation, it is necessary to guarantee
that the pressure in the tank line is at least 5 bar (73 psi)
higher than that in the leakage oil line at all times. This
pressure differential must be measured, documented
and communicated to the manufacturer to prevent the
warranty on the hydraulic motor becoming null and
void.Contact the authorized Customer Center / Dealer in
your area before removing the check valve.
n
Clean the area around the shut-off valve on the left
side of the boom.
n
Remove the end cap from the shut-off valve on the
boom and save for future use.
n
Unscrew the end cap from the pressure line and save
for future use.
n
Connect the pressure line to the shut-off valve fitting
of the supply line on the left side of the boom.
n
Clean the area around the shut-off valve on the right
side of the boom.
n
Remove the end cap from the shut-off valve of the
boom and save for future use.
n
Unscrew the end cap for the tank line and save for fu-
ture use.
n
Connect the tank line to the shut-off valve fitting of
the return line on the right side of the boom.
Note: To transport leakage oil from the hydraulic mo-
tor of the drum cutter, use the separate leakage oil
line of the carrier. If a separate leakage oil line is not
available, it is necessary to install one ( see chapter
First installation / Install separate leakage oil
line
). Installation of a leakage oil line to drain oil to
tank is the responsibility of the operator.
NOTICE
Environmental damage due to hydraulic oil
Hydraulic oil is environmentally harmful and must not
penetrate the ground or enter the water table or water
supplies.
u
Collect any hydraulic oil which escapes.
u
Dispose of it in accordance with the applicable
environmental regulations.
n
Position an oil receiver tank beneath the leakage oil
line of the drum cutter.
n
Use a funnel to fill up the leakage oil line with hy-
draulic oil until it overflows.
n
Connect the leakage oil hose from the drum cutter
onto the separate leakage oil line of the carrier's
boom.
Summary of Contents for ER 100 L
Page 2: ......
Page 7: ...Contents Anbaufräsen PC GmbH 3390 5221 01 2020 09 07 Original Instructions 7 ...
Page 95: ......