![EPAK DSi13Ku Pro Installation And User Manual Download Page 13](http://html1.mh-extra.com/html/epak/dsi13ku-pro/dsi13ku-pro_installation-and-user-manual_2417136013.webp)
Step 1
Release the
skew
movement by
turning the handle into upward position as
shown in the figure.
Step 2
Release the
elevation
movement
by turning the handle to downward position
as shown below.
Step 3
Release the
roll
movement by
turning the handle to the right as shown in
the figure below
Step 4
Release
azimuth
movement by
turning the handle left as shown below.
4.7
Installing the Indoor Unit
Before installing the IDU, find a suitable location for the equipment within cable lengths. Ensure that the
display of the control unit can be easily read and the front-panel is accessible. Also, allow sufficient room for
connecting the cables behind the control unit. Check the following diagram to find the dimensions of the unit.
Doc ID 0304 03.07.20
Page 13/32
Figure 4.8: ACU Front view
Figure 4.7: Transportation lock open-closed
Summary of Contents for DSi13Ku Pro
Page 29: ...Drilling Pattern DSi6 Doc ID 0304 03 07 20 Page 29 32 Figure 8 1 Drilling Pattern 60cm VSAT...
Page 30: ...Drilling Pattern DSi9 Doc ID 0304 03 07 20 Page 30 32 Figure 8 2 Drilling Pattern 90cm VSAT...
Page 31: ...Drilling Pattern DSi13 Doc ID 0304 03 07 20 Page 31 32 Figure 8 3 Drilling Pattern 130cm VSAT...