EOS Zeus HD / Zeus L HD - Installation and Operating Instructions
EN-27
Installation
9
Reassemble the heater:
a)
Place the heating element on the tubular heating elements in the
heater.
b)
Plug the cable into the terminal box and lock into place.
c)
Screw in the safety pins and tighten them.
d)
For 30 kW and 36 kW models: insert the stone attachment.
e)
Set the decoration ring in place.
f)
Place the stones in the rock store.
Do not lay stones on the decoration ring.
Only use stones with a grain size of 100–150 mm.
See 5.1 Filling rock stores with stones,
10
Start the heater.
4.2.3 Establishing an electrical connection,