![EOS P 396 Training Manual Download Page 65](http://html1.mh-extra.com/html/eos/p-396/p-396_training-manual_2416808065.webp)
Basic information on materials
4.5
Training manual • Basic training • Status 03.14
EOS P 396
4
Storage of the powder
For consistent quality of the parts and a trouble-free building process, EOS
recommends the following storage conditions for plastic powder.
1)
From a storage time of 2 years from the test date on the material certificate a loss of quality due to
ageing is possible.
2)
On opening the sacks, temperature and atmospheric humidity should correspond to the installation
conditions for the machine in the operating state.
3)
In the case of open bins the powder must be protected against soiling.
4)
The storage duration is necessary for the electrostatic charging of the powder produced by mixing to
dissipate.
Temperature
[°C]
Atmospheric
humidity [%]
Storage
duration
New powder, used powder,
sieved used powder (recycled powder),
refreshed powder
-> In closed bins
5 - 35
20 - 70
2 years
1)
New powder
-> Prior to opening the sacks
15 - 20
50 - 80
Min. 24 h
2)
> 20 - 25
40 - 60
> 25 - 30
30 - 45
New powder, used powder,
recycled powder, refreshed powder
-> In bins with air change
3)
20 - 25
40 - 60
Max. 6 months
25 - 30
30 - 45
Powder after sieving/mixing
In bins with air change
3)
20 - 25
40 - 60
Min. 24 h
4)
25 - 30
30 - 45
Refreshed powder (conditioned)
-> In multibox (closed bins)
5 - 35
20 - 80
non-
condensing
Min. 24 h
4)
For long-term storage the plastic powder should be stored in closed bins to avoid
soiling.
Summary of Contents for P 396
Page 1: ...1Training manual 1EOS P 396 1Installation ConditionBasic training ...
Page 2: ......
Page 3: ...1EOS P 396 1Laser sintering system for plastics ...
Page 4: ......
Page 12: ...0 Contents 0 8 Training manual Basic training Status 03 14 EOS P 396 ...
Page 13: ...1 1About this manual ...
Page 14: ......
Page 19: ...2 2Laser sintering process ...
Page 20: ......
Page 32: ...2 Laser sintering process 2 12 Training manual Basic training Status 03 14 EOS P 396 ...
Page 33: ...3 3Layout function of machine and accessories ...
Page 34: ......
Page 59: ...4 4Basic information on materials ...
Page 60: ......
Page 68: ...4 Basic information on materials 4 8 Training manual Basic training Status 03 14 EOS P 396 ...
Page 69: ...5 5Part Property Management ...
Page 70: ......
Page 83: ...6 6Data preparation ...
Page 84: ......
Page 111: ...7 7Operation of machine accessories ...
Page 112: ......
Page 137: ...8 8Process monitoring ...
Page 138: ......
Page 149: ...9 9Troubleshooting and maintenance ...
Page 150: ......
Page 168: ...9 Troubleshooting and maintenance 9 18 Training manual Basic training Status 03 14 EOS P 396 ...
Page 169: ......