![EOS P 396 Training Manual Download Page 48](http://html1.mh-extra.com/html/eos/p-396/p-396_training-manual_2416808048.webp)
3
Layout, function of machine and accessories
3.14
Training manual • Basic training • Status 03.14
EOS P 396
IPCM EOSINT P 3
Overview
Layout
Function
The
Integrated Process Chain Management
(
IPCM
) with its components is a
production tool for the cost-effective manufacture of parts in an industrial
environment. The IPCM EOSINT P 3 with automated powder conveying and
Unpacking station with powder recycling makes possible ergonomic working
conditions with little dust. Together with the exchangeable frame system, optimal
machine utilisation and a high level of automation is provided.
A Spiral conveyor
B Machine
C Dosing station
D Unpacking and sieving station
E Recycled powder conveying
Summary of Contents for P 396
Page 1: ...1Training manual 1EOS P 396 1Installation ConditionBasic training ...
Page 2: ......
Page 3: ...1EOS P 396 1Laser sintering system for plastics ...
Page 4: ......
Page 12: ...0 Contents 0 8 Training manual Basic training Status 03 14 EOS P 396 ...
Page 13: ...1 1About this manual ...
Page 14: ......
Page 19: ...2 2Laser sintering process ...
Page 20: ......
Page 32: ...2 Laser sintering process 2 12 Training manual Basic training Status 03 14 EOS P 396 ...
Page 33: ...3 3Layout function of machine and accessories ...
Page 34: ......
Page 59: ...4 4Basic information on materials ...
Page 60: ......
Page 68: ...4 Basic information on materials 4 8 Training manual Basic training Status 03 14 EOS P 396 ...
Page 69: ...5 5Part Property Management ...
Page 70: ......
Page 83: ...6 6Data preparation ...
Page 84: ......
Page 111: ...7 7Operation of machine accessories ...
Page 112: ......
Page 137: ...8 8Process monitoring ...
Page 138: ......
Page 149: ...9 9Troubleshooting and maintenance ...
Page 150: ......
Page 168: ...9 Troubleshooting and maintenance 9 18 Training manual Basic training Status 03 14 EOS P 396 ...
Page 169: ......