![EOS P 396 Training Manual Download Page 113](http://html1.mh-extra.com/html/eos/p-396/p-396_training-manual_2416808113.webp)
Operation of machine & accessories
7.1
Training manual • Basic training • Status 03.14
EOS P 396
7
Operation of machine & accessories
Overview
The initial installation of the software required and the licensing of the software, as
prerequisites for the operation of the machine, should already have been undertaken.
However, it can be necessary to update the software and the licences at any time.
Prior to starting the building process, it is necessary to setup and prepare the
machine and to warm up the machine to building temperature. At the end of the
automatic warm up phase, the building process starts.
The SLI parts data are, depending on the method of working, either prepared with
the offline version of the
PSW
on a workstation, or directly in the machine
PSW
, and
loaded onto the machine as a job and started.
After the end of the building process, the exchangeable frame with the parts lying in
the bed of powder must cool down in the machine. Then the exchangeable frame is
removed from the machine and the parts unpacked with the aid of the components
of the IPCM EOSINT P.
On unpacking the parts, excess used powder is sieved and as recycled powder mixed
with new powder. The resulting refreshed powder can be used for a new building
process.
The parts are then cleaned of plastic powder in the Shot-peening cabinet.
Administering EOS software
Installing EOS software products
1.
Close all open applications.
2.
Place CD-ROM in the CD-ROM drive on the computer.
3.
Start installation:
•
Open Windows Explorer, select CD-ROM drive and click the installation file
eoSuite.exe
Or
➢
You will receive the
PSW
and other software products required together with
the machine on a CD-ROM.
You cannot start the programs from the CD-ROM, instead you must install
them on the hard disk.
➢
To start the
PSW
you will need a CmStick (USB dongle).
Summary of Contents for P 396
Page 1: ...1Training manual 1EOS P 396 1Installation ConditionBasic training ...
Page 2: ......
Page 3: ...1EOS P 396 1Laser sintering system for plastics ...
Page 4: ......
Page 12: ...0 Contents 0 8 Training manual Basic training Status 03 14 EOS P 396 ...
Page 13: ...1 1About this manual ...
Page 14: ......
Page 19: ...2 2Laser sintering process ...
Page 20: ......
Page 32: ...2 Laser sintering process 2 12 Training manual Basic training Status 03 14 EOS P 396 ...
Page 33: ...3 3Layout function of machine and accessories ...
Page 34: ......
Page 59: ...4 4Basic information on materials ...
Page 60: ......
Page 68: ...4 Basic information on materials 4 8 Training manual Basic training Status 03 14 EOS P 396 ...
Page 69: ...5 5Part Property Management ...
Page 70: ......
Page 83: ...6 6Data preparation ...
Page 84: ......
Page 111: ...7 7Operation of machine accessories ...
Page 112: ......
Page 137: ...8 8Process monitoring ...
Page 138: ......
Page 149: ...9 9Troubleshooting and maintenance ...
Page 150: ......
Page 168: ...9 Troubleshooting and maintenance 9 18 Training manual Basic training Status 03 14 EOS P 396 ...
Page 169: ......