7.3 Upon completion of commissioning/service
Ensure that the TSI is removed and the LCD display is
plugged back in. The LCD screen will then show the boiler
temperature.
Note, if the boiler was to lockout for any reason, this LCD
screen will indicate a fault code. Please see Fault Finding on
page 28 for further information.
This will take you back to the “
Parameters setting pages
”
From here press the “
Save & Finish
” button to exit the Ser-
vice and Commission procedure.
Fig. 26
The burner will then reset. Once the burner has been
successfully commissioned the screen will display the water
temperature and a flame symbol to show that the burner is
in operation.
Fig. 27
7.2 Setting the Boiler Setpoint Temperature
To set the boiler setpoint temperature. Press the
“EOGB
Logo”
in the top left hand corner to open the “
System
Ramp Test Screen
”
Fig. 28
On the “
System Ramp Test Screen”,
press the
“Next”
button
in the bottom right hand corner to move through the
different setting windows until you reach the
“Max CH
Setpoint Option”
Fig. 29
To alter the temperature setpoint simply press the + or -
buttons to adjust
“Max CH Setpoint”
Fig. 30
Please note that EOGB pre-set and highly recommend this
setting to be left at 70 °C to ensure correct flow and return
temperatures for the system design.
Once the
“Max CH Setpoint”
set, press the “
Save & Finish
”
Button.
Fig. 31
Please ensure that all necessary paperwork has been
completed and includes the commissioning and service
logs at the back of the user manual.
Fig. 27
Fig. 26
Fig. 28
Fig. 31
Fig. 30
Fig. 29
Boiler Operation and Commissioning