6.2
ROLLER BEDS
Fig. 12
Use the straps/handles (
) outside the
corners of the container to handle the container
on roller beds.
6.3
AMBIENT CONDITIONS
Ensure that the container is handled in accordance with the specified limits and ambient
conditions.
Refer to chapter 2. Limits, Ambient Conditions
6.4
SHIPMENT DURATION
If the duration of the shipment is longer than 35 hours charging of the container should be
considered whenever it is in a warehouse.
6.5
WRAPPING
Wrapping MUST NOT be applied to the container. If the container is wrapped the air inlets
and outlets are blocked and the container can not work properly.
Door side
Aft side
19 (40)
Doc No:
MO-RAP-3079
Revision:
17
State:
Released
Release Date:
2019-04-25
Approved By:
maxf