33
Secondary Installation
Figure 64. E20 complete log set-up with embers burning.
NOTE: While the glass is still removed, it is recommended that the gas line be purged by lighting the
pilot.
When lighting the fireplace for the first time since the log set and embers have been installed/replaced,
watch for ignition at ALL the burner ports. If a long delay is noticed, turn the appliance off and wait for
it to cool down. Remove the glass and rearrange the ember material, making sure none of the burner
ports air holes are blocked.
Never operate the fireplace with the glass door removed.
Figure 63. Log Set and Ember Installation.