background image

REQUIRED MANTLE CLEARANCES 

 
 
 
 
MAKE SURE THAT THE MANTLE INSTALLATION STAYS 
WITHIN THE SHADED AREA IN THE DIAGRAM 
PROVIDED. 
 
 
THE MAXIMUM ALLOWABLE MANTLE WIDTH IS 10” (25.4 
CM)  
 
 
THE MINIMUM HEIGHT FROM THE TOP OF THE 
SURROUND PANEL TO A 10” (25.4 CM) WIDE MANTLE IS 
11” (27.94 CM) 
 
 
 
 
 
 
 
 
 

VENT RESTRICTIONS: 

THIS SECTION IS DESIGNED TO SHOW THE MINIMUM AND MAXIMUM VENT LENGTHS FOR BOTH HORIZONTAL AND 
VERTICAL INSTALLATIONS 

WHEN VENTING THIS APPLIANCE YOU MUST STAY WITHIN THE 
SHADED AREA (see venting chart provided) FOR ALL VENTING 
APPLICATIONS. 
 
 
 

VENT RESTRICTOR RING:

 A vent restrictor ring is supplied with 

each direct vent fireplace. This restrictor ring is to be installed when the 
vertical chimney installation is over 4’ (1.21 M). Before the chimney is 
placed onto the stove, place this vent restrictor ring into the 4” (10.16 
CM) flue pipe(as shown), once the vent restrictor ring has been installed, 
the vertical sections of chimney can be installed. 
 

NOTE

:

 This shaded area designates the need for a vent restrictor ring. 

 
 
 
 
 
 

Insert restrictor ring 
in the 4” (10.16 cm) 
flue pipe 

 

7

Summary of Contents for EG 33

Page 1: ...AT TO DO IF YOU SMELL GAS Open windows Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbor s p...

Page 2: ...allation must conform to local codes or in the absence of local codes with the current CAN 1 B 149 installation code in Canada or the current National Fuel Gas Code ANSI Z223 1 in the USA To prevent i...

Page 3: ...e all been certified for use with either natural or propane gases see control panel and rating label Are not for use with solid fuels Must not be connected to a chimney flue serving a separate solid f...

Page 4: ...here it can be accessed by a gas supply line Locate the stove in a large and open room that is centrally located in the house This will optimize heat circulation and comfort As the stove could be equi...

Page 5: ...re that the top header above the framing opening is installed on the edge or upright this will maintain proper clearances to the vent pipe NOTE MAKE SURE THAT THE UNIT HAS BEEN INSTALLED SO THAT THE B...

Page 6: ...supplied The unit can now be enclosed with the rest of the house finishing Place a sheet of drywall around the unit covering the nailing flanges and stopping on the unit body Place the finished tile...

Page 7: ...PLIANCE YOU MUST STAY WITHIN THE SHADED AREA see venting chart provided FOR ALL VENTING APPLICATIONS VENT RESTRICTOR RING A vent restrictor ring is supplied with each direct vent fireplace This restri...

Page 8: ...inimum C Clearance to permanently closed window minimum 12 inches 30 cm recommended to prevent condensation on window D Vertical clearance to ventilated soffit located above the terminal within a hori...

Page 9: ...ption 908B 6 Pipe Length Black 907B 9 Pipe Length Black 906 B 12 Pipe Length Black 904 B 24 Pipe Length Black 903 B 36 Pipe Length Black 902 B 48 Pipe Length Black 911 B 11 to 14 5 8 Pipe Adjustable B...

Page 10: ...n the pipe They may be located by examining the inside of the female ends as shown in FIG 10 NOTE 1 Twist lock procedure four indentations located on the female end of the pipes and fittings are desig...

Page 11: ...nation bolts onto the flat portion of the vinyl siding standoff shaded area in FIG 12 so that an air space will exist between the wall and the vent termination NOTES 1 The horizontal run of vent pipe...

Page 12: ...pipe and elbows may be utilized in the attic as well as above the roofline The galvanized finish is desirable above the roofline due to the higher corrosion resistance STEP 6 Once the pipe sections h...

Page 13: ...required at the second floor and any subsequent floors FIG 19 The opening should be framed to 10 inch x 10 inch inside dimensions in the same manner as shown in FIG 16 2 Any occupied areas above the...

Page 14: ...mbly 4 Spread ember pieces in a single layer evenly across the front burner ember tray Place a single layer of embers on top of the front burner 5 Carefully avoid any clumping or large build ups Do no...

Page 15: ...f all electrical power to the appliance 15 HI LO knob Control knob 3 Turn the gas control knob clockwise to the off position 4 Open door Wait five 5 minutes to clear out any gas Close door If you smel...

Page 16: ...the joint in the tape in a bottom corner Close door Glass must be purchased from an Envirogas dealer No substitute materials are allowed CLEANING THE INSIDE OF THE FIREBOX Remove the log carefully fro...

Page 17: ...thermocouple Air in gas line Pilot flame dies while knob is depressed Bleed line Check gas line pressure Contact dealer Burners will not remain lit Problem with thermopile circuit Check gas line pres...

Page 18: ...ted from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1 2 psig 3 5 kP...

Page 19: ...bracket in the center rear of the appliance Place blower over the two screws provided on the base of the appliance 4 Install the electrical box on either the left side of the appliance This electrical...

Page 20: ...ot injector Install the new pilot injector BE CAREFUL WHEN TIGHTENING THE PILOT FITTING YOU COULD BREAK THE CERAMIC IGNITER ELECTRODE STEP 6 Re install the pilot assembly in the reverse order of STEP...

Page 21: ...er The paint on the Metal Brick Liner may peel This is due to the extreme conditions applied to the paint and is no way covered under warranty Your dealer shall make all claims under this warranty in...

Page 22: ..._________ 22 Name of Installer ___________________________________________ Address _________________________________________ __ ___________________________________________ ____________________________...

Reviews: