
Connecting to the Network
3-18 Installation
4.
Verify
that
a
link
exists
by
checking
that
the
port
RX
(Receive)
LED
is
ON
(flashing
amber,
blinking
green,
or
solid
green).
5.
If
the
RX
LED
is
OFF
and
the
TX
(Transmit)
LED
is
not
blinking
amber,
perform
the
following
steps
until
it
is
on:
a.
Verify
that
the
cabling
being
used
is
Category
5
UTP
with
an
impedance
between
85
and
111 ohms.
Category 5
cabling
must
be
used
for
1000
Mbps
operation.
b. Verify
that
the
device
at
the
other
end
of
the
twisted
pair
segment
is
on,
and
properly
connected
to
the
segment.
c.
Verify
that
the
RJ45
connectors
on
the
twisted
pair
segment
have
the
proper
pinouts
and
check
the
cable
for
continuity.
Typically,
a
crossover
cable
is
used
between
hub
devices.
A
straight
‐
through
cable
is
used
to
connect
between
switches
or
hub
devices
and
an
end
user
(computer).
Refer
to
Figure 3
‐
9
and
Figure 3
‐
10
for
four
‐
wire
RJ45
connections.
Refer
to
Figure 3
‐
11
and
Figure 3
‐
12
for
eight
‐
wire
RJ45
connections.
Figure 3-9 Four-Wire Crossover Cable RJ45 Pinouts, Connections Between Hub
Devices
Note:
When installing Mini-GBICs in the front-panel ports 1 through 18, you may need
to select a group of ports to verify the port operation. Initially GROUP 1 LED is green,
indicating that the status RX/TX LEDs are showing the activity on Group 1 ports
(1 through 6). To view the receive and transmit activity on another group, press the
GROUP SELECT button for less than one second (refer back to
Figure 3-7
) to step to
the next GROUP (1, 2, or 3) of 6 ports. The receive and transmit activity for that group
of segments is then indicated by the RX and TX LEDs for each segment.
1
RJ45 device port
3
RJ45-to-RJ45 crossover cable
2
Other device port
4
RX+/RX- and TX+/TX- connections.
These connections must share a common color pair.
TX+
TX
RX+
RX 2
1
3
6
TX+
TX
2
1
3
6
RX+
RX
À
Á
Â
Ã
Summary of Contents for Matrix 7G4280-19
Page 2: ......
Page 12: ...x...
Page 27: ...LANVIEW Diagnostic LEDs DFE Platinum Series Hardware Installation Guide 1 7...
Page 28: ...LANVIEW Diagnostic LEDs 1 8 Introduction...
Page 64: ...Completing the Installation 3 34 Installation...
Page 80: ...Regulatory Compliance A 8 Specifications...
Page 90: ...Memory Replacement Procedures B 10 Mode Switch Settings and Installing Options...