RAK131B_ENG / 2022-10-14
6 / 24
5
.2. Cable entries
•
Take the cable routing into consideration when planning the installation. The supply cable can be
routed into the enclosure from the rear or bottom. Default cable routing is from the bottom.
•
The M32 cable gland for the supply cable is pre-assembled on the bottom of the charging station.
•
If it is necessary to open additional cable entries, you have to disassemble the charging station.
Installation steps when cable routing is from alternative cable entries
1.
Disassemble the charging station.
Remove the screws
2pcs.
Remove the screws 5pcs.
Remove the installation box from the base.
Remove the screws 4pcs.
Remove the installation box cover.
Screw fixing: Remove the screws 2pcs.
Mechanical lock: Unlock the hatch with a coin or suchlike.
Installation box
Installation
box cover
Base
TX20
3
2
1
4