6. INSTALLATION
6.1
. PRELIMINARY INSPECTION
The destoner is supplied in a package containing: no.1 instruction manual; no. 1 fully assembled destoner with
power supply cable and plug . The safety grid is install inside the hopper.
After unpacking the machine check that it is in good condition, if necessary informing the manufacturer of
any evident defects. Notify Enoitalia s.r.l in writing of any defects found within a fortnight of receiving the
machine.
Check that the machine corresponds to the order specifications.
When moving the machine, observe safety regulations on the movement of goods. If using
automatic hoisting devices, check that the weights are correctly balanced.
If the machine is to be moved manually make sure that the brakes are disabled
Dispose of the packaging as required by current legislation.
6.2. POSITIONING
When positioning the destoner consider the aspects mentioned above in relation to the choice of site.
The height at which the destoner should be placed should be such as to prevent the operator from accessing
the rotating shaft with his/her hands or arms.
To such purpose remember that it is OBLIGATORY to fit the safety grid inside the loading
hopper. That grid is an integral part of the machine, and standard accessory to ensure safety
of the same.
7. WASHING AND CLEANING THE MACHINE FIRST INSTALLATION.
Wash the machine thoroughly to eliminate any manufacturing residues and the dust which has built up on the
surface, taking care not to wet the electrical parts and keeping the power supply cable disconnected.
Following is described the opening system
Remove the four locking bolt to remover the rear protection (it could be necessary to lose the grub screw of
the central bearing), and remove the 4 knobs to remover the basket cover.
Remove the shaft. Lose the bolt of the basket and remove the basket.
The machine is completely open and accessible for cleaning. It is possible remove also the lower collection
tank to have a better washing.
After cleaning, reinsert the basket and block with bolt. Then install the shaft, and the rear protection
Once the machine has been washed, install the safety box (as shown in figures 1 and 4).
If the electrical parts do get wet, dry them fully before starting up the machine.
Summary of Contents for DELTA 1
Page 14: ......