INSTALLATION
1.
Mount Probe to Well
. Connect the threaded end of the probe to a well
access port. A reducing bushing down to as little as 1/2” can be used if
necessary, however it is better to use as big as possible up to 2”. The well
watch pushes air pressure waves
into the well. It is therefore
important that the connection to
the well and top of the well be
closed to air to prevent the air
pressure from escaping and for the
Well Watch to perform correctly. It
is best to install the probe mostly
vertical with the wire connection
toward the lower side to prevent
any water leakage past a poor
seal. Also keep in mind that the
probe is heavy and may require
additional support if connected to
the well with a small or flexible
tube.
2.
Mount Controller
. Mount the
controller in a protected area.
It is not weather proof and will
suffer damage if exposed to
the elements. It can be
mounted in any orientation
using the screw flange or to a
DIN rail where access to the
keypad and visibility of the
display can be achieved.