
19
IOM, ZS/ZT Models
Enertech Global
SECTION 4: UNIT DATA INFORMATION
Unit Dimensional Data
DETAIL A
DIM. SAME FOR RIGHT
HAND RETURN
REVISION HISTORY
REV
DESCRIPTION
ECN
DATE
APPROVED
B
ADD ZS-ZT INFORMATION 15-272
6/1/16
BDL
LEFT VIEW
TOP VIEW
Showing Optional Filter Rack
G:\Drafting\Drawings\Released-Production\PDF\20D805-05NN REVB
LEFT HAND RETURN
FRONT ISO VIEW
UNIT FRONT
RIGHT HAND RETURN
UNIT FRONT
LEFT HAND RETURN
TOP VIEW
LEFT HAND RETURN
TOP VIEW
SHOWN WITH OPTIONAL
FILTER RACK MOUNTED
TO THE UNIT
Filter Rack Note:
Optional filter rack duct opening
size matches the opening size
of the supply duct flanges that are
included with the unit. See
Dimensional Data for details.
Optional filter rack may be used
with either a 1" or a 2" thick filter.
UNIT PITCH FOR
CONDENSATE DRAIN
1/4" - 1/2"
Pitch
CONDENSATE DRAIN FITTING
PVC STUB INCLUDED WITH UNIT
SEE NOTES TO THE RIGHT.
Condensate Drain Notes:
Unit must pitch from level towards
the condensate drain for proper
drainage. Confirm that condensate drains
properly from unit and that the amount of
pitch does not cause condensate leaks
inside of the unit.
Units are equipped with overflow protection.
Be sure to leave adequate height for the P-Trap
in applications where clearance could be an issue.
In some high humidity applications you may need to
apply insulative tape around condensate drain fitting.
OPTIONAL FILTER RACK
2.4
"N"
- SEE
DIM. DATA