
13
IOM, ZS/ZT Models
Enertech Global
SECTION 3: INSTALLATION CONSIDERATIONS
Horizontal Unit Suspension Hanger Locations and Dimensions
REVISION HISTORY
REV
DESCRIPTION
ECN
DATE
APPROVED
A
SETUP AND RELEASE
16-288-N01
10/5/16
BDL
LEFT VIEW
Enertech Recommends a Minimum of
2 to 2.5 Feet of Service/Installation
Access at Front and Air Coil Side
TOP VIEW
Showing Optional Filter Rack
B:\ENGINEERING\RECORDS\Component Drawings\PDF\20D805-46NN REVA
Reference dimensional data enclosed.
Units utilize FPT source water connections.
Units with Desuperheater utilize FPT connections.
Electrical knockouts are sized to 1/2" or 3/4"
conduit.
LEFT HAND RETURN CABINET
21.47
21.81
63.02
1.09
1.01
1.44
1.01
1.01
1.44
19.22
1.01
19.56
1.09
58.02
1.44
19.22
1.01
1.01
54.02
19.56
1.09
TOP VIEW
060-072
TOP VIEW
036-048
TOP VIEW
018-030
CORNER
WITH
DRAIN
OUTLET
CORNER
WITH
DRAIN
OUTLET
CORNER
WITH
DRAIN
OUTLET
RIGHT HAND RETURN CABINET
21.81
1.09
1.01
1.01
1.44
21.47
1.01
19.56
1.09
1.01
1.44
19.22
1.01
1.09
19.56
1.44
19.22
1.01
CORNER
WITH
DRAIN
OUTLET
CORNER
WITH
DRAIN
OUTLET
CORNER
WITH
DRAIN
OUTLET
TOP VIEW
018-030
TOP VIEW
036-048
TOP VIEW
060-072
FRONT OF UNIT
FRONT OF UNIT
FRONT OF UNIT
FRONT OF UNIT
FRONT OF UNIT
FRONT OF UNIT
54.02
58.02
63.02