| Commissioning Document
©2019 OutBack | an EnerSys company
FA
-KF-10/
11
/2019
Page 7 of 12
Parallel Settings
After completing the network settings, navigate to the home screen on the master and tap the
SkyBox icon. On the
Configure
menu screen labeled
PARALLEL SETTINGS
, change the
Units Installed
number to the appropriate value (2). Enable the
Endpoint Termination
. These settings tell the system
how many units are in the stack and which units will start and end communications.
(Home screen
SkyBox icon
Configure
Edit
Arrow down twice)
Next, move to the slave unit. Log in as
Installer
. Change the
Ethernet Connection
toggle to
SkyBox
.
Change the
Units Installed
to the appropriate value (2). Enable the
Endpoint Termination
.
Full System Start-Up
To align the new settings between the SkyBoxes, completely power down the system by opening all
breakers. Proceed through the following steps to re-start the system.
If batteries are not present, start units from grid.
1. Shut battery breakers on each unit in the system, starting with the master.
a. Startup from battery should take approximately 45 seconds to 1 minute.
2. Check that
Units Installed
matches
Units Detected.
a. Login as
Installer
b. Return to home screen
c. Tap SkyBox icon in the upper right section of the screen
d. Tap
Configure
e. Arrow down twice
f. If
Units Detected
equals the
Units Installed
proceed to Step 3.
g. If these values are different, check the communications cables for proper seating.
Cycle power to the affected unit.
3. Shut the grid breakers to each unit.
4. Using the power button, turn the system on from the master UI.
5. Shut the PV disconnects to each unit.
Figure 8 – Parallel settings for a master unit and a slave unit