
9212 Installation Instructions
14
3.0 Pre-Installation
System Check List
3.1 Parts Check
Check package contents to ensure it contains the
following parts:
P/N
Qty.
Description
FG9841A
1
9212 Control/Display
Unit
2
Current Transformer –
8420-3028
One pair of two types:
or
200 Amp
Current Transformer
8420-3029
400 Amp
Current Transformer
1
Relay Unit -
FG9202A-XXXIXXX
one of 2 types
or
Surface Mount Indoor
NEMA1
FG9202A-XXXRXXX
Rain Tight Outdoor
NEMA-3R
9000-02101
4
Control/Display Unit
Mounting Clips
2520-1001
4
Control/Display Unit
Mounting Screws
09000-67102
1
Control/Display Unit
Mounting Template
9212-94100C
1
Owner’s/Installation
Manual w/Warranty
Registration Card
Note:
Digits marked with “X” may vary depending
with the number and type of relays in system, size and
type of enclosure, alarm and current transformer op-
tions.
Note:
Notify your Energy Sentry dealer if any parts
are missing.
1.0 Introduction
This section contains instructions for installation,
checkout, and programming the Energy Sentry 9212
Residential Electric Demand Controller.
In order to
ensure proper installation and warranty coverage,
please read this section thoroughly before actually
proceeding with the installation.
Note:
All wiring must be installed in accordance
with national and local electrical codes.
Important:
If the Energy Sentry 9212 is to be con-
nected to a heat pump compressor or air conditioning
compressor, ensure that you complete Section 17, “Sys-
tem Programming.”
2.0 Tools and
Materials Required
2.1 Tools Required
•
Flat blade type screwdriver
•
Phillips head screwdriver
•
Drywall Knife
•
Pliers
•
Amp-Clamp Current Sensor (if available)
•
Digital Volt Meter (required for trouble
shooting only)
2.2 Material Required
(not provided)
•
Four 1/4" x 1" lag bolts and/or appropriate hard-
ware for mounting Relay Unit
•
15 Amp single pole circuit breaker for demand
controller 120 VAC Power Supply
•
Sufficient length of 4 Conductor Control Cable -
Energy Sentry P/N - 0715-0009 or Belden #8489 or
equivalent. This cable has 4-#18 AWG Conduc-
tors, 300V rated. Thermostat Wire is not accept-
able and may cause the controller to read power
incorrectly.
Use of thermostat wire will void the
warranty.
•
Sufficient length of appropriate hookup wire (#
14 AWG) to connect 120 volt power and ground
from load center to Relay Unit. Sufficient con-
duit, #10 AWG or #12 AWG wire (depending on
load size), and associated hardware to connect
load center to Relay Unit (if required).