background image

©2010 Enerdrive Pty Ltd 

3

Installation

2.0 Installation

Before installing the ME-BMK, read this entire section to be aware of all aspects 

of the installation; then you can thoroughly plan the details to ensure the overall 

system requirements are accomplished.
To assist you in planning and designing your installation; you should review the 

basic system diagram shown in Figure 2-1.  If another network device besides the 

ME-BMK is to be installed, refer to section 2.3 to determine your specific network 

configuration.

Info: Installations should be performed by qualified personnel, such as a 

licensed or certified electrician.  It is the installer’s responsibility to deter-

mine which safety codes apply and to ensure that all applicable installation 

requirements are followed.  Applicable installation codes vary depending 

on the specific location and application.
Info:  Review  the  “Important  Product  Safety  Information”  on  the  front 

inside cover page before any installation.

Review the following guidelines prior to performing the Installation:
•  The ME-BMK sense module is connected to the inverter by a 3m communications 

cable and to the DC shunt using a 1.5m twisted-pair signal wire.  Before installing 

the ME-BMK Sense module and connecting any wires, determine: 1) the commu-

nications cable route throughout the home or vehicle/boat to the inverter, and 2) 

the twisted-pair signal wire route to the ME-BMK shunt.

Info: The communications cable may be extended beyond the supplied 

3m; but to ensure voltage accuracy, do not extend the 1.5m twisted-pair 

wire used between the DC shunt and sense module.
Info: For information on the size of the battery cable and overcurrent 

protection device to be used in the installation, refer to the inverter’s 

owner’s manual.

2.1 Required Components and Tools

2.1.1 List of supplied components in the ME-BMK (see figure 2-1):

•  Installation and Operation manual

•  Sense Module (with two #8 x 3/4” Phillips mounting screws)

•  500A/50mv DC Shunt (with two #8 x 3/4” Phillips mounting screws)*

•  3 metre Communications cable

•  1.5 metre Twisted-pair (blue and orange color) signal wires

2.1.2 List of other Required Equipment and Materials:

•  MagnaSine Inverter with network port (ME, MS or RD Series)

•  ME-RC (MagnaSine ME-RC remote display with revision ≥ 2.0)

•  Batteries (with appropriately sized cables)

•  Short (~457mm) battery cable (to connect shunt to battery negative)

•  In-line fuse holder (with 2-amp DC fuse)

•  DC Breaker (or DC fuse and disconnect) for inverter

•  Phone-splitter (if using multiple network devices)

2.1.3 Tools Required to install the ME-BMK:

•  Flat-blade screwdrivers (1/4” and 1/8” blades)

•  #2 Phillips screwdriver

•  9/16” open-end wrench or adjustable crescent wrench

Summary of Contents for MagnaSine ME-BMK

Page 1: ...ME BMK Battery Monitor Kit Owner s Manual...

Page 2: ...ral electrical codes This product is designed for indoor compartment installation It must not be exposed to rain snow moisture or liquids of any type Use insulated tools to reduce the chance of electr...

Page 3: ...1 ME BMK Installation Diagram 4 Figure 2 2 DC Shunt Connections 5 Figure 2 3 Sense Module Connections 6 Figure 2 4 Multiple Network Devices Star Configuration 7 Figure 2 5 Multiple Network Devices Dai...

Page 4: ...iv 2010 Enerdrive Pty Ltd...

Page 5: ...ut voltage Temperature and battery bank capacity automatically compensated and coordinated between inverter and battery monitor Precision 500A 50mv DC shunt included in ME BMK Automatic efficiency det...

Page 6: ...te is easily displayed but doesn t provide an accurate State Of Charge under all charge and discharge conditions Theses devices have advantages and disadvantages based on accuracy and ease of use The...

Page 7: ...nnecting any wires determine 1 the commu nications cable route throughout the home or vehicle boat to the inverter and 2 the twisted pair signal wire route to the ME BMK shunt Info The communications...

Page 8: ...4 2010 Enerdrive Pty Ltd Installation Figure 2 1 ME BMK Installation Diagram...

Page 9: ...s is not possible adequate forced ventilation should be provided to keep the shunt operat ing temperature below 60 C CAUTION Before beginning the installation ensure all AC power is dis connected from...

Page 10: ...connection 2 connect the orange wire from the 2 terminal on the 4 port terminal block to the small screw on the load side of the shunt positive shunt sense connection Info Ensure these blue and orange...

Page 11: ...network port via a phone splitter to the inverter using individual cable runs see figure 2 4 Since each device is independently connected to the inverter s MagnaSine Net or network port problems in a...

Page 12: ...batteries inefficiencies while charging a charge efficiency setting is provided The charge efficiency setting compensates the AH I O AmpHrs In Out reading by ensuring the amphrs returned to the bat t...

Page 13: ...would be more inaccurate with every charge For this reason continually monitor the AH I O reading under the 03 BM Meters menu After several charge and discharge cycles below 80 SOC the AH I O reading...

Page 14: ...Map ME BMK Displays 4 0 METER Menu Map The following figure is a complete overview of the battery monitor settings and information displays available under the METER menu for the ME BMK Familiarize yo...

Page 15: ...nergy loses while charging and is one of the factors used to determine the battery s State Of Charge SOC The battery s State of Charge which is the best indicator of the condition of the batteries is...

Page 16: ...the connected battery bank The SOC represents the condition of the battery as a percentage of the avail able capacity left in the battery Range is 0 to 100 where 100 represents a fully charged batter...

Page 17: ...displayed value resets to zero Info The AH I O display correlates with the 03 Batt AmpHr setting under the SETUP button to help determine the 02 BM SOC display Info AH I O example if you run a 10 amp...

Page 18: ...mine the issue BM Ready The BM is connected and actively monitoring the battery system 05 BM SETUP This menu allows the battery s charging efficiency to be automati cally determined or manually select...

Page 19: ...Figure 5 6 Resetting the Max DC Value Figure 5 5 Resetting the Min DC Value Max DC This menu displays the highest battery voltage since the last reset The voltage shown on the display is averaged each...

Page 20: ...transmitting and receiving correctly with network devices Green BLINKING Not able to communicate with remote display A If the remote display is off refer to the remote s operation manual for troubles...

Page 21: ...ding is incorrect Measure the voltage between the red terminal 4 positive and black terminal 3 negative wire on the terminal block in the sense module If the voltage at the Sense module and the voltag...

Page 22: ...AH increments tAH Out Total Amp Hours Removed 0 to 65 535 000 amp hours 0 1k or 100 AH increments Min Max DC 7 00 to 70 00 VDC resettable Shipping Weight 2 lbs Includes Manual Sense Module DC shunt tw...

Page 23: ...at the time the original purchaser returns the product for repair determined by the price paid by the original purchaser Enerdrive shall not be liable for any other losses or damages 4 Upon request fr...

Page 24: ...PN 64 0013 MagnaSine by Enerdrive Unit 11 1029 Manly Road Tingalpa Queensland Australia 4173 Ph 1300 851 535 email sales enerdrive com au www enerdrive com au...

Reviews: