31
Commissioning
•
The same requirements apply to generators with an insulation monitoring de-
vice (IMD).
•
Only rubber-insulated flexible cables of the type H07RN-F or H07BQ-F may
be used on construction and assembly locations.
•
Electrical equipment must be spray water protected and meet the regulations
for rough operation.
7.1
Transport and setup of your generator
The following requirements must be fulfilled before you can transport the gener-
ator:
Requirements
The installation area must have an even and load carrying substrate
The generator must be turned off
The generator is cooled down
NOTICE!
Leaking engine oil and operating fluids can contaminate the soil and
groundwater.
► Ensure that the generator is transported horizontally and mounted.
► Make all efforts, at all costs, to prevent escaping of operating fluids.
► Dispose of contaminated soil immediately and according to regulations.
Manual transporting
WARNING!
Danger due to a high device weight.
Risk of crushing through sliding or a falling down machine
► Observe the empty weight from to 160 kg.
► The device must be carried by four people.
► Only lift the device using the carrying handles.
► Raise/lower device evenly.
► Walk slowly.
Carrying the gener-
ator
1. Fold out the so that they are fully out.
2. Lift the generator simultaneously and evenly from all four sides.
3. Carry the generator slowly to its place of use.
4. Lower the device evenly.
5. Fold in the carrying handles so that they are fully in
The generator has been carried to its place of use and positioned.
Loading by crane
Only use lifting devices that are suitable and approved for the weight of the de-
vice and have a safety device to prevent slipping out during loading
Requirements
The ground at the installation site must be even and be capable of bearing
the load.
The generator is turned off.
The generator has cooled down.